PLAN for TEST RUN : early Jan 2008
- Hall A and C Interaction.
- Hall C running Gep at high current (50 uA).
- Need source setup. (Kent, Riad, et.al.).
- Lumi Studies
- Flip rates 30, 250, possibly others. And oversampling.
- Replace / re-design PMTS ? Long lead item !
- Get 18-bit ADC ready (Bob, Brian).
- Make sure dithering works (Kent)
- Check PREX detector in Moller Setup (Piotr, KK, Eugene)
- Compton Integrating DAQ (Bob, Sirish, Gregg, Alexandre)
- FADCs with accumulators. DAQ moved into Hall A this summer (Bob, et.al.)
- New crystal ? Long lead item !
- 12-stage PMT ? Long lead item !
- Test cavities at low current (Musson, Bob)
- Get receivers from G0 expt. Install in Hall A this summer.
- New firmware for low-current running installed.
- Lead target tests
- PREX target at 50+ uA. (Final design assembly test)
- Will also run e06007 lead experiment for about 1 week.
LONG-TERM SCHEDULE
- Beam test Jan 2008 (see above).
- Begin Moller installation in Jan 2008.
- Compton must be ready Aug 1, 2008. Try to test earlier, during He3.
- Septum takes a year, should start this Fall.
- HAPPEX-III or PREX in Feb 2009.
MISCELLANEOUS
- Summer tests:
- Electronics crosstalk
- Laser table tests to validate new switch.
- Pedestal noise
- PMT linearity
- PVDIS trigger setup.
- Spectrometer Simulation Needs
- Understand acceptance effects
- Spot size sensitivity
- Poletip
- Predict focal plane, need for detector design.
- 2005 Lumi Analysis at UMass/SU.
- Test at Duke/TUNL ? Need to know energy specs and formulate a plan.
- Need more info on melted Pb target. Design update. (Bob).
- Monte carlo on neutrons for Compton detector. (Gregg).
- 2nd BPM (spare) at dispersive ? (Bob to check).
- Do we need shielding for PMTs ?