Meeting held at JLab in room 16/84 from 10am to 12am
with:
Jeff, Clive, Tom, Bogdan, Mike, Albert, Artush and Franck
Report
-
RTV cookie/mold: I gave the new mold to Jeff so he can start doing
cookies right away. He will give them to Albert on monday if possible so
Albert can test the optical coupling for the next meeting. Albert is not
sure though the meniscus is big enough. I personnally think the spring
is not strong enough. I checked one base with force applied and no force
applied and basically the optical coupling was the same.
-
Parts ordering(drawing/ordering): I'll give the new drawings to
Larry Munk at the end of this week to have a new cost estimate.
-
Circuit board/Components: We will receive the first 50 on monday
or tuesday next week. I will give a few to Albert so he can check that
everything is right as it should be. Then I will ask the company to send
the remaining 750 in about a 2 week delay. The components are supposed
to arrive early next week also.
-
Cooling system: Nothing new. Albert showed us a prototype of a cooling
"line" for the real thing. It it composed of a "big" hose on each column
of the calorimeter. Then small hoses connected to the big one go to each
base. It also has the cables clamped to it. Albert criticized himself his
prototype: the air flow was very different from one hose to another. He
had a drawing to show us of the next thing he will try. Ask him directly
for details.
-
Tube cutting at ODU: 240 housing tubes are cut already. It will
take about a month to get the 800 big tubes ready and another 2 weeks for
the small ones (circuit board housing).
-
Updated task list: We mostly talked about who is doing what for
when during this meeting and I consequently updated the task
list and timetable.