Meeting held at JLab in room 16/84 from 10am to 12am
with:
Jeff, Sue, Bogdan, Eugene, and Franck
Report
-
RTV cookie/mold: Albert has ordered a "test" mold in Aluminum to
test several meniscus radius. It will hopefully be there next week.
-
Parts ordering: Updated drawings have been given to Larry Munk for
requisition. It ends up costing about $75'000, definitely more than we
expected.
-
Circuit board/Components: We have received the second batch of circuit
boards: 750 pieces. Albert has checked them, they seem just fine.
-
Monitoring system: I gave the JLab Fed-Ex number to SLAC so we can
receive the Clermont-Ferrand Xenon lamp soon.
-
Calorimeter ration: Sue has run a montecarlo to dig out the size
ratio we should take to maximize our counting rates. A very preliminary
result is that the ratio of the height to the width is close to 2. We will
of course check this result again to be sure.
-
Tubes cutting: Clive, supervised by Jeff has finished cutting the
tubes (both long and short ones). However, 500 of the small tubes are 1/8"
too small. We can either had a ring or cut 500 more. We'll ahve to discuss
the price.
-
Tube anodizing: The tube anodizing costs $1.97 each for the long
ones, a little less for the small ones. The problem is that the socket
doesn't fit anymore if we anodize the small tube, unless we don't anodize
one side of the tube to put the socket in.
-
Connectors: Eugene thinks that we should go and buy lemo connectors
if we have the money, because simpler connectors would need some extra
sticky tape to hold well enough. Maybe we can go for lemos for the signal
connector and some different kind for HV. We have to decide soon.
Franck Sabatie - 07/28/1999
PLEASE, fill free to mail any
remarks or advice to Franck Sabatie,
they will be transmitted and discussed at the next meeting.