+-------------------------+ | June 8 LOG BOOK SUMMARY | +-------------------------+ First run with beam 956 15 cm H2 target 956 10 uAmp 957 10 uAmp 958 10 uAmp WC HV being changed ??? 959 3 uAmp ? 960 no notes in log book for this run 961 3 uAmp beam increase WC HV up to 2610 V 962 963 10 uAmp 964 ask for access to move sweep magnet 965 access (about 1 hr) to put magnet in place 24 ns removed from TDC start for veto counters change in coinc timing 966 run ended because lost beam last run with beam (?) +--------------------------+ | June 10 LOG BOOK SUMMARY | +--------------------------+ Good beam about 10am Beam current: 25 uAmp run 981: short run run 982: junk Beam current: 50 uAmp run 983: production run. coda crash 141327 events. type 7: 13184 run 984: continue production run after crash. stopped for Bogdan to work on WC magnet tests access to install shielding on wire chamber also removed some excess aluminum from in front of calorimeter Beam current: 5 uAmp (12:30) run 985: junk run 986: magnet off ~11k events run 987: magnet +88 amp ~11k events run 988: magnet -88 amp ~10k events magnet off radiator in Beam current: 25 uAmp (12:40) run 989: production run ~57k events run 990: production run ~7k events HV was off(?) +---------------------------+ | July 1-2 LOG BOOK SUMMARY | +---------------------------+ parasitic data. Beam 95 uAmp 1049 gain matching 1050 junk 1051 sum_A thr = 70 ev: 5142 1052 60 7490 1053 40 7649 1054 20 5787 1055 20 10674 1056 junk 1057 junk 1058 gain matching 1059 gain matching 1060 pulser test 1061 " 1062 " 1063 " 1064 " 1065 " BEAM 1066 5 uAmp check rastering 1067 50 uAmp check out run 37425 ev 1068 5 uAmp WC 2700 V "production run" sum_A th = 50 ev: 22514 1069 5 uAmp sum_A th = 50 ev: 2219 1070 sum_A th = 75 mv ev:52167 12:15 am changing magnet in the hadron arm 12:25 changing to 4 cm H target scaler scan vs beam 1071 5 uAmp 1072 11 1073 20 1074 30 9297 events 1075 40 8327 events threshold scan 40 uAmp beam 1076 100 mV thresh ev: 5621 1077 80 ev: 6763 1078 60 ev: 7492 1079 40 6834 H arm: 2.377 GeV 32.19 deg 1080 25 uAmp 4 cm target field not quite stabilized ev: 40555 magnet is stable 1:40 1081 same conditions as 1080 coda crash ev: 77100 1082 same conditions ev: 97215 1083 10 uAmp beam. 1084 same conditions. Ev: 147790 Total beam time available: 10:15 pm to 6:00 am = 465 min % time used for production running = 357/465 = 77%