Things accomplished:
- Finished spin down and tests on Brunhilde.
- Finished water cell flux calculation
(39.59 cm^2)
- Finished water signal calibration.
C_w = 0.0639 mV/(amg*%*cm^2)
- Changed lifting motor with Al.
- Created a cell/coil position data
sheet.
- Measured dimenisons of Brunhilde
and calculated volumes.
- Preliminary flux calculation of
Brunhilde.
Things to do:
- Need wall thickness on Brunhilde
and Exodus.
- Measure exterior dimensions of Exodus.
- Install Exodus and begin spin up
and tests on Exodus.
- Look into EPR and spectrum analyzer
optics.