Target Lab Status

Things accomplished:

    - Finished spin down and tests on Brunhilde.
    - Finished water cell flux calculation (39.59 cm^2)
    - Finished water signal calibration.  C_w = 0.0639 mV/(amg*%*cm^2)
    - Changed lifting motor with Al.
    - Created a cell/coil position data sheet.
    - Measured dimenisons of Brunhilde and calculated volumes.
    - Preliminary flux calculation of Brunhilde.

Things to do:

    - Need wall thickness on Brunhilde and Exodus.
    - Measure exterior dimensions of Exodus.
    - Install Exodus and begin spin up and tests on Exodus.
    - Look into EPR and spectrum analyzer optics.