SBS Weekly April 11, 2018 Present Riordan, Shahinyan, Tireman, Annand, Cornejo, Montgomery Wojtsekhowski, Quinn, Puckett, Camsonne, Fuchey Cao Agenda - Shahinyan, ECal Progress Frame is designed into two parts by JLab designers Have significant work for front end electronics DAQ platform layout is ready for test lab PMT bases will need to be rebuilt (being done by JMU, Niculescu) Have ordered 300 light guides of BK7, to order high temperature epoxy New light guides 25% less transparency, not sure if due to polishing Modules will be tightened with spring Shows picture of assembled supermodule Using 5mil copper foil to wrap blocks Has elliptic Al tube, two holes to flow air to rear Not using silicon rings yet - may damage foil wrapping, not tested Heating similar to C16 Able to estable heating gradient with 3x3 module, ~60W 40C in rear with no PMTs and full cooling (40inH2O) goes to 60C with no cooling Shows drawings from JLab designers Front frame ordered, arrive July or August Needs lots of manpower to build Jack will develop flowmeter for GEM chambers as well as this using hot wire Andrew wants to know density of blocks Not clear how many of different blocks are available Albert says number of yellow blocks are 5-10%