Run Coordinator Weekly Summary


Entry Date:06/13/2007
Hall:Hall_A
Run Coordinator: B. Sawatzky
Experiment Number: E04-018/E03-101


Preceding Week (Tuesday owl shift through Monday swing shift)


 
Number of Hours
% of Scheduled
Scheduled Program
134
N/A
CW Beam on Target
86
64%
Acceptable Beam in Use (ABU)
80
60%


Major Causes of Down/Lost Time in the Hall:
# of Hours
Cause
3
LHRS hut door controller failure, ROC power supply failure
2
DAQ checkout during commissioning
1
ROC hard reset
maxlength=250


Down/Lost Time causes listed above represent 100% of total lost time in the hall.

Percentage of total experiment data collected to date: 20%

Percentage of total scheduled experiment hours to date: 20%


Special Task Results:
Moller measurement Results: target 5: -42.3+/-0.2%, target 3: -41.2+/-0.3%


Upcoming Week

Program for the Upcoming Week:
Production running with max 50 uA of current. 3 pass (3 GeV) running through to energy change on Saturday, then 5 pass beam (4 GeV). There are no polarization requirements for 3 GeV or 4 GeV running. We anticipate a change from 5->2 pass (1.6 GeV) on Tuesday coincident with Hall C`s pass change. We are evaluating whether polarization will be critical to extract the necessary physics at this energy.

Planned Special Task:

Special Requests:
FFB on (energy and position), raster on.

Significant Problems Pending:


General Comments/Concerns

Beam Quality Issues:

Other:
Thanks to all the teams that are working on the machine operation and stability issues.