Sheet 10: RunPlan for Shift worker




GamPP run on 1.077 GeV

Kinematic point No 1; Theta CM=90

HRS Right: theta=-62.62degP=1094.693MeV/C
HRS Left: theta= 62.62deg P=1094.693MeV/C

Detailed measurement table can be found at the web site under 'Run Plan'

Runs:


1)Take a Pointing/Optics measurement - dont forget to ask for Raster-off

2)Ask MCC for Raster-ON, size:3.5 X 4.5 and check that you get 2mm X 2mm on the spot++
3)
  • Verify that the Target is 3HE.
  • Set Radiator to 6%.
  • Set FPP carbon door width - 6+3 inch
  • Ask MCC for Current:30uA,Raster-ON
  • hrs coincidence goal:104167(T5) (estimated time 10 hours).

4)
  • Verify that the Target is 3HE.
  • Set Radiator to OUT.
  • Verify that FPP carbon door width - 6+3 inch
  • Ask MCC for Current:50uA,Raster-ON
  • hrs coincidence goal:17361(T5) (estimated time 3 hours).

5)
  • Verify that the Target is EMPTY.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • (estimated time 4 hours).

6)
  • Verify that the Target is EMPTY.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • (estimated time 1 hours).

7)
  • Verify that the Target is Cu.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • (estimated time 5 hours).

8)
  • Verify that the Target is Cu.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • (estimated time 2 hours).

9)
  • Verify that the Target is C.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • (estimated time 5 hours).

10)
  • Verify that the Target is C.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • (estimated time 2 hours).

11)
  • Verify that the Target is 3HE.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • hrs coincidence goal:10417(T5) (estimated time 1 hours).

12)
  • Verify that the Target is 3HE.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • hrs coincidence goal:5787(T5) (estimated time 1 hours).

GamPP run on 2.097 GeV

Kinematic point No 2; Theta CM=90

HRS Right: theta=-53.69degP=1711.45MeV/C (NEED TO RECYCLE MAGNETS)
HRS Left: theta= 53.69deg P=1711.45MeV/C (NEED TO RECYCLE MAGNETS)

Detailed measurement table can be found at the web site under 'Run Plan'

Runs:


1)Take a Pointing/Optics measurement - dont forget to ask for Raster-off

2)Ask MCC for Raster-ON, size:3.5 X 4.5 and check that you get 2mm X 2mm on the spot++
3)
  • Verify that the Target is 3HE.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • hrs coincidence goal:185(T5) (estimated time 1 hours).

4)
  • Verify that the Target is 3HE.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • hrs coincidence goal:1000(T5) (estimated time 3 hours).

5)
  • Verify that the Target is Dummy.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • (estimated time 2 hours).

6)
  • Verify that the Target is Dummy.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • (estimated time 1 hours).

7)
  • Verify that the Target is Cu.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • (estimated time 2 hours).

8)
  • Verify that the Target is Cu.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • (estimated time 1 hours).

9)
  • Verify that the Target is C.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • (estimated time 2 hours).

10)
  • Verify that the Target is C.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • (estimated time 1 hours).

Kinematic point No 2a; Theta CM=70

HRS Right: theta=-70.4degP=1375.666MeV/C
HRS Left: theta= 39.62deg P=2032.225MeV/C (NEED TO RECYCLE MAGNETS)

Detailed measurement table can be found at the web site under 'Run Plan'

Runs:


11)Take a Pointing/Optics measurement - dont forget to ask for Raster-off

12)Ask MCC for Raster-ON, size:3.5 X 4.5 and check that you get 2mm X 2mm on the spot++
13)
  • Verify that the Target is 3HE.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • hrs coincidence goal:185(T5) (estimated time 1 hours).

14)
  • Verify that the Target is 3HE.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • hrs coincidence goal:1000(T5) (estimated time 3 hours).

15)
  • Verify that the Target is Dummy.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • (estimated time 0.5 hours).

Kinematic point No 2b; Theta CM=60

HRS Right: theta=-80.18degP=1212.069MeV/C
HRS Left: theta= 33.27deg P=2177.175MeV/C (NEED TO RECYCLE MAGNETS)

Detailed measurement table can be found at the web site under 'Run Plan'

Runs:


16)Take a Pointing/Optics measurement - dont forget to ask for Raster-off

17)Ask MCC for Raster-ON, size:3.5 X 4.5 and check that you get 2mm X 2mm on the spot++
18)
  • Verify that the Target is 3HE.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • hrs coincidence goal:185(T5) (estimated time 1 hours).

19)
  • Verify that the Target is 3HE.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • hrs coincidence goal:1000(T5) (estimated time 3 hours).

20)
  • Verify that the Target is Dummy.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • (estimated time 0.5 hours).

Kinematic point No 2c; Theta CM=50

HRS Right: theta=-91.29degP=1056.708MeV/C
HRS Left: theta= 27.25deg P=2306.885MeV/C (NEED TO RECYCLE MAGNETS)

Detailed measurement table can be found at the web site under 'Run Plan'

Runs:


21)Take a Pointing/Optics measurement - dont forget to ask for Raster-off

22)Ask MCC for Raster-ON, size:3.5 X 4.5 and check that you get 2mm X 2mm on the spot++
23)
  • Verify that the Target is 3HE.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • hrs coincidence goal:185(T5) (estimated time 1 hours).

24)
  • Verify that the Target is 3HE.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • hrs coincidence goal:1000(T5) (estimated time 3 hours).

25)
  • Verify that the Target is Dummy.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • (estimated time 0.5 hours).

Kinematic point No 2d; Theta CM=40

HRS Right: theta=-104.1degP=913.998MeV/C
HRS Left: theta= 21.51deg P=2418.02MeV/C (NEED TO RECYCLE MAGNETS)

Detailed measurement table can be found at the web site under 'Run Plan'

Runs:


26)Take a Pointing/Optics measurement - dont forget to ask for Raster-off

27)Ask MCC for Raster-ON, size:3.5 X 4.5 and check that you get 2mm X 2mm on the spot++
28)
  • Verify that the Target is 3HE.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • hrs coincidence goal:185(T5) (estimated time 1 hours).

29)
  • Verify that the Target is 3HE.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • hrs coincidence goal:1000(T5) (estimated time 3 hours).

30)
  • Verify that the Target is Dummy.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • (estimated time 0.5 hours).

GamPP run on 3.117 GeV

Kinematic point No 3; Theta CM=90

HRS Right: theta=-47.98degP=2275.954MeV/C (NEED TO RECYCLE MAGNETS)
HRS Left: theta= 47.98deg P=2275.954MeV/C

Detailed measurement table can be found at the web site under 'Run Plan'

Runs:


1)Take a Pointing/Optics measurement - dont forget to ask for Raster-off

2)Ask MCC for Raster-ON, size:3.5 X 4.5 and check that you get 2mm X 2mm on the spot++
3)
  • Verify that the Target is 3HE.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • hrs coincidence goal:1000(T5) (estimated time 60 hours).

4)
  • Verify that the Target is 3HE.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • hrs coincidence goal:278(T5) (estimated time 30 hours).

GamPP run on 4.065 GeV

Kinematic point No 4; Theta CM=90

HRS Right: theta=-44.11degP=2781.799MeV/C (NEED TO RECYCLE MAGNETS)
HRS Left: theta= 44.11deg P=2781.799MeV/C (NEED TO RECYCLE MAGNETS)

Detailed measurement table can be found at the web site under 'Run Plan'

Runs:


1)Take a Pointing/Optics measurement - dont forget to ask for Raster-off

2)Ask MCC for Raster-ON, size:3.5 X 4.5 and check that you get 2mm X 2mm on the spot++
3)
  • Verify that the Target is 3HE.
  • Set Radiator to 6%.
  • Ask MCC for Current:30uA,Raster-ON
  • hrs coincidence goal:327(T5) (estimated time 112 hours).

4)
  • Verify that the Target is 3HE.
  • Set Radiator to OUT.
  • Ask MCC for Current:50uA,Raster-ON
  • hrs coincidence goal:91(T5) (estimated time 56 hours).