E04-018 Shift Check List
Date:
 
 
Owl
Day
Swing
Time
 
 
 
Your name
 
 
 
Visual Hall Inspection
 
 
 
Beam Energy (MeV)
 
 
 
Beam Current (uA)
 
 
 
SPOT size X/Y (mm)
 
 
 
Beam Position at 1H04A X/Y (mm)
 
 
 
Hall A beam position feedback
 
 
 
Left Arm Angle
 
 
 
Left Cryo Level Ok
(He>60%, N>25%)
 
 
 
Left Arm Momentum (GeV)
 
 
 
Left Arm NMR Ok?
 
 
 
Left Arm Q1 (A)
 
 
 
Left Arm Q2 (A)
 
 
 
Left Arm Dipole (A)
 
 
 
Left Arm Q3 (A)
 
 
 
Right Arm Angle
 
 
 
Right Cryo Level Ok
(He>60%, N>25%)
 
 
 
Right Arm Momentum (GeV)
 
 
 
Right Arm NMR Ok?
 
 
 
Right Arm Q1 (A)
 
 
 
Right Arm Q2 (A)
 
 
 
Right Arm Dipole (A)
 
 
 
Right Arm Q3 (A)
 
 
 
Argon Pressure (PSI)
 
 
 
Ethane Pressure (PSI)
 
 
 
CO2 pressure (PSI)
 
 
 
Ozone (ppm)
 
 
 
Left VDC gas flow
(top/bottom)
 
 
 
Right VDC gas flow
(top/bottom)
 
 
 
Left VDC HV on
(top/bottom)
 
 
 
Right VDC HV on
(top/bottom)
 
 
 
Left S1/S2, shower1, shower2 HV on?
 
 
 
Right S1/S2 HV on
 
 
 
Left Shield Hut Temperature (F)
 
 
 
Right Shield Hut Temperature (F)
 
 
 
Target type
 
 
 
Target pump speed (Hz)
 
 
 
Target temperature
 
 
 
Target pressure
 
 
 
Latest run number
 
 
 
Computer deadtime
 
 
 
Prescale PS1/PS2
 
 
 
Prescale PS3/PS4
 
 
 
Prescale PS5/PS6/PS7
 
 
 
Rates T1/T2 (Hz)
 
 
 
Rates T3/T4 (Hz)
 
 
 
Rates T5/T6 (Hz)
 
 
 

Back