E89044 Shift Checklist

Date: (mm/dd)
        
        
        
        
        
        
Time (hh/mm, 24:00)
 
 
 
 
 
 
Your Initials
 
 
 
 
 
 
Beam Energy (MeV)
 
 
 
 
 
 
Beam Current (uA)
 
 
 
 
 
 
Magnet stripchart saved? From hac
 
 
 
 
 
 
Beam optics stripcharts saved? From hiresxt20
 
 
 
 
 
 
OTR IN and source Hall A? Check MaxVideo on hiresxt20
 
 
 
 
 
 
Last harp scan?
 
 
 
 
 
 
Fast feedback on (position/energy)?
 
 
 
 
 
 
SPOT x/y (mm)
 
 
 
 
 
 
Beam Position x/y (< 0.1 mm)
 
 
 
 
 
 
Visual Hall Inspection
 
 
 
 
 
 
Argon Pressure (EPICS GUI)
 
 
 
 
 
 
Ethane Pressure (EPICS GUI)
 
 
 
 
 
 
HRSE VDC Gas Flow
 
 
 
 
 
 
HRSH VDC Gas Flow
 
 
 
 
 
 
HRSE Angle
 
 
 
 
 
 
HRSH Angle
 
 
 
 
 
 
HRSE Collimator
 
 
 
 
 
 
HRSH Collimator
 
 
 
 
 
 
HRSE Quad #1 (A)
 
 
 
 
 
 
HRSE Quad #2 (A)
 
 
 
 
 
 
HRSE Dipole (A)
 
 
 
 
 
 
HRSE Dipole Probe Low (T)
 
 
 
 
 
 
HRSE Dipole Probe High (T)
 
don't do it anymore
 
HRSE Quad #3 (A)
 
 
 
 
 
 
HRSH Quad #1 (A)
 
 
 
 
 
 
HRSH Quad #2 (A)
 
 
 
 
 
 
HRSH Dipole (A)
 
 
 
 
 
 
HRSH Dipole Probe (T)
 
 
 
 
 
 
HRSH Quad #3 (A)
 
 
 
 
 
 
HRS Cryo Levels
(He>60.0%, N>40%)
 
 
 
 
 
 
HRSE VDC #1 HV (kV)
 
 
 
 
 
 
HRSE VDC #2 HV (kV)
 
 
 
 
 
 
HRSH VDC #1 HV (kV)
 
 
 
 
 
 
HRSH VDC #2 HV (kV)
 
 
 
 
 
 
HRSE S1 HV OK?
 
 
 
 
 
 
HRSE S2 HV OK?
 
 
 
 
 
 
HRSE Preshower HV OK?
 
 
 
 
 
 
HRSE Aerogel Cerenkov HV OK?
 
 
 
 
 
 
HRSE Gas Cerenkov HV OK?
 
 
 
 
 
 
HRSE Shower HV OK?
 
 
 
 
 
 
HRSH S1 HV OK?
 
 
 
 
 
 
HRSH S2 HV OK?
 
 
 
 
 
 
HRSH S0 HV OK?
 
 
 
 
 
 
HRSE momentum (GeV/c)
 
 
 
 
 
 
HRSH momentum (GeV/c)
 
 
 
 
 
 
Latest Run Number
 
 
 
 
 
 
Computer Deadtime
 
 
 
 
 
 
HRSE VDC Efficiency (%)
 
 
 
 
 
 
HRSH VDC Efficiency (%)
 
 
 
 
 
 
Data Disk
 
 
 
 
 
 
PS 1 - 5
 
 
 
 
 
 
Event 1 Rate
 
 
 
 
 
 
Event 2 Rate
 
 
 
 
 
 
Event 3 Rate
 
 
 
 
 
 
Event 4 Rate
 
 
 
 
 
 
Event 5 Rate
 
 
 
 
 
 
http://www.jlab.org/~kuss/e89044/shift/checklist.html