next up previous contents
Next: Starting Q2/3 Power Supply: Up: Field Monitoring Previous: Powering Up Dipole Magnets:   Contents

Starting Q1 Power Supply:

Do this when a fault causes the power supply to shut off.
Wait for fault to clear (watch He levels).
1. Push RESET (check all faults cleared)
2. Select desired polarity
3. Push ON
4. Type in ISET (yellow field) or re-enter P0 in Autopilot Mode).



Joe Mitchell 2000-02-29