Message ID: 14     Entry time: 08/13/04, 14:45
Author: Franck Sabatie 
Subject: DVCS Beam meeting minutes - 08/13/04 
Present: Hari, Zafer, Pierre, Srish, Franck

Beam requirements:

Beam size: 50 < x < 150  75 < y < 250  with X:Y is 1:1.5
                       (ideal 80 by 120)
Beam position stability: +- 0.1 mm

Energy: 5.75 GeV

Polarization: as large as possible, >85% with super-lattice.

Energy spread: 6x10-5

Current: 3uA except during calibration ~80-100 uA
          ( no raster during 3 uA )
           current measurement accuracy of 1%
FFB on Energy and position mode

SLI will be monitored and Target OTR will be inserted on demand

Beam thru Compton Chicane with background of 200 Hz/uA or better

30 Hz pseudo-direct report.