Moller Measurements Summary for E05-109 HAPPEX-III, August - October 2009
The Moller results are presented in a table below and on plots 1
and 2
The Moller measurements results for HAPPEX-III running time were reanalyzing in summer 2010. New analysis includes
more accurate beam polarization calculation by using scalers fit and more detailed systematic error analysis.
# date Beam Polar. Stat.err. Syst.err. Wien,deg --------------------------------------------------------------- 1 08.27.2009 -79.07 +/- 0.11 +/- 1.7% 44.3048 2 08.28.2009 -79.89 +/- 0.09 +/- 1.7% 44.3048 3 08.31.2009 -88.65 +/- 0.11 +/- 1.7% 14.20 4 09.05.2009 -89.69 +/- 0.10 +/- 1.7% 17.20 5 09.11.2009 +89.86 +/- 0.10 +/- 1.7% 17.20 6 09.17.2009 -88.73 +/- 0.10 +/- 1.7% 17.20 7 09.23.2009 -89.41 +/- 0.10 +/- 1.7% 17.20 8 10.04.2009 -89.45 +/- 0.09 +/- 1.7% 17.20 9 10.11.2009 +88.92 +/- 0.10 +/- 1.7% 17.20 10 10.13.2009 -88.79 +/- 0.11 +/- 1.7% 17.20 11 10.22.2009 -89.49 +/- 0.09 +/- 1.7% 17.20
08.31 - Spin dance. Wien filter angle change.
09.05 - New Wien filter angle.
09.11 - 86.12 +/- 1.28stat +/- 1.03sys (IHWP=OUT).
09.17 - Mott: 84.21 +/- 2.01stat +/- 1.01sys (IHWP=OUT, after beam spot move).
09.23 - Mott: 86.63 +/- 0.93stat +/- 1.04sys (IHWP=IN).
10.04 - Mott: 84.08 +/- 1.01stat +/- 1.01sys (IHWP=IN, after beam spot move).
10.13 - Hall A: 12 October beam spot move was done.
MOTT: IHWP=IN, Mott Data Taken: 16Oct09 08:36:28, Polarization: (86.38 +/- 0.92stat +/- 1.04sys) %
Hall A: IHWP=OUT, Mott Data Taken: 16Oct09 08:43:48, Polarization: (85.62 +/- 0.87stat +/- 1.03sys) %
Mott: (IHWP=IN) 86.38 +/- 0.92stat +/- 1.04sys
10.22 - Measurement was done after power outage (22 October).
10.25 - Hall A laser phase study. No beam polarization measurement was done.
The details of the measurements can be found here .