Moller Measurement Checklist


This file: www.jlab.org/~moller/moll_proc_2009.html, last updated: May 4, 2009
moller@jlab.org

Here is a checklist for Moller measurements.   The significant dangers are:
  1. High current on Moller target would destroy it.
  2. Incorrect configuration settings could lead to useless data.

SETUP

Beam and Screens

  1. Ask MCC to shut the beam off and to mask the main-experiment target.
  2. Move the main-experiment target to the empty position.
  3. During Spring 2009 running, turn off Bigbite HV for wire chambers.
  4. Setup the following diagnostic windows.   (NewTools on hacsbc2)

  5. Ask MCC to load the Moller magnetic settings.   This depends on energy.   Cycle Q1,Q2,Q3, D, check on the screen mentioned below.
  6. Beam current 1 uA CW.
  7. Check beam position at Moller target (1H01).   Need abs(X) < 0.5 mm and Abs(Y) < 1 mm at 1H01.
  8. Need to close the slits to 15-16.   (this kills tails from other halls beams)
  9. Normally want an energy lock, either on Hall A or C.


Detectors and DAQ Setup

  1. Moller DAQ:   moller @ adaql1.
  2. cd /home/moller/Java/msetting
  3. Type ``mpc''
  4. Load discriminator settings :   DETSET.new
  5. Default 49 needs to change on 1 and 2:   Typically set to 270 and 300 for 1 and 2.
  6. Check position of peak in ADC spectra to adjust threshold (see analysis below).
  7. PLU module   /out 2.   Channels 0, 1, 3, 4, 12 should be selected with check box.
  8. HV Settings   Load Voltage Set:   Select the file for correct beam energy.
  9. Enable all HV settings for all energies (except channels 3 and 11 which are normally zero).
  10. Portserver Info
  11. Starting the DAQ
  12. Raw data are stored in /adaql1/data1/moller
  13. Settings are in /home/moller/daq/coda2/RunInfo

MEASUREMENT

Data Taking and Analysis

  1. Take a CODA run
  2. Analysis   is done in Paw.
  3. List of measurements with date:   /home/moller/paw/moller/meas
  4. cd paw/moller
  5. Type ``paw''   (to enter paw)
  6. In paw use commands like these:

Finishing and Filing Report

Procedure to finish the Moller measurement and back out of setup.
  1. Pull out the Moller target.   Position RL.
  2. Disable all HV on detectors.
  3. Ask MCC to restore regular magnet settings on Moller magnets.
  4. Remind shift workers to run spot++ at 5 uA to verify raster before putting in production target.
  5. Final Analysis Steps :