Target A links:
Cryotarget Info
Meeting Minutes
Target Status
Target Drawings
Cryotarget Team
Other links:
Hall C Cryotarget
EPICS
Hall A Home Page
Jefferson Lab
|
Documentation:
Target Test Plans:
- Target Commissioning Run Plan, Oct., 1997
- Table 1: 15 cm H2 Run Plan, Oct., 1997
- Table 2: 4 cm H2 Run Plan, Oct., 1997
- Table 3: 15 cm D2 Run Plan, Oct., 1997
- Table 4: 4 cm D2 Run Plan, Oct., 1997
- Neon Test Plan, Sept., 1997
- Abstarct Submitted to DNP meeting, July, 1997
- Target cell pressure test results, Dec., 1996
- Target Design Review Meetings:
- Target Lifting Mechanism Progress Report ( 23 July 1996)
- Etching and Plating Target Cells
- IP Breakout Box for Hall A Cryotarget
- Cryotarget Thermometry
- Loop Pump Controller:
- Cryogenic Target Control System:
|