25 Feb 2006


First time we have beam.
Electron trigger(T2) rates dependence to BB Total Sum(TS) threshold values was measured, based on run 2195.

Current: 5uA

Threshold (mV / MeV)20 / 10040 / 20060 / 300
Rate (Hz)1.014 *1065.980 *1041.830 *104


Current: 2uA

Threshold (mV / MeV)60 / 30080 / 400
Rate (Hz)74302800


Current: 10uA

Threshold (mV / MeV)80 / 400100 / 500120 / 600
Rate (Hz)1.5 *10462002700



26-27 Feb 2006

DC VME crates was changed to FastBus? crates with.


28 Feb 2006


BB HV was adjasted using elastic run 2429.

HV settings before adjastment:
/w/work3503/e02013/GEn/adaq.bk/adev/slowc/HV_BB/hv_set/bb_hv_28_02_2006.set

Hv settings after adjastment:
/w/work3503/e02013/GEn/adaq.bk/adev/slowc/HV_BB/hv_set/bb_hv_28_02_2006_adj2429.set

Adjastment factors based on run 2429:
/w/work3503/e02013/GEn/adaq.bk/adev/slowc/scripts/adj_sh_2429.dat - for Shower.
/adj_ps_l_2429.dat - for left PS.
/adj_ps_r_2429.dat - for right PS.



01 Mar 2006


Background rate calculation for different beam positions.



Run #TargetCurrent (uA)Time (sec)AxAyBxByRate (Hz)Rate per uA (Hz/uA)
2461Reff cell empty1.194290-0.221-1.451-0.352-0.7510.3280.275
2462Reff cell empty5.217330-0.318-1.599-0.387-0.8641.8820.361
2463Reff cell empty0.625325-0.274-1.333-1.493 0.4780.1850.296
2464Reff cell empty0.629295-0.240-1.433-1.559-2.8260.2340.372
2465Reff cell empty0.628305-0.263-1.297 0.880-0.9200.2620.417
2466Reff cell empty0.558300-0.281-1.325 0.926 0.3900.3570.640



02 Mar 2006


Counting rates was calculated for Vacuum, HE3 and H2 targets, both for electrond and pions.
Based on runs 2461, 2473 and 2485.

Run #TargetCurrent (uA)Time (sec)AxAyBxByElectrons rate per uA (Hz/uA)Pions rate per uA (Hz/uA)
2461Vacuum1.194290-0.221-1.451-0.352-0.7510.2750.436
2473He31.1921837-0.215-1.639-0.347-0.8174.5513.194
2485H22.1451826-0.268-1.659-0.354-0.8094.4162.994





03 Mar 2006


BB Scintillators time resolution study.

For scintillators 5 and 6 was ploted following distribution:

(LT5 + RT5)/2 - (LT6 + RT6)/2, where
LT - left PMT time, RT - right PMT time, numerical index - scintilator bar number.
Sigma for this distribution was 1.48ns.


Then same distribution was ploted with cut on scintillators amplitude value:
LA5>400 && RA5>400 && LA6>400 && RA6>400, where
LA - left PMT amplitude, RA - right PMT amplitude, numerical index - scintilator bar number.
Sigma for this distribution was 0.45ns.

Same calculations was made form all scintillator bars, combined into pairs:
1&2, 2&3, 3$4 ... 11&12, 12&13.


Scintillator barsDistributionCutsSigmaComment
1 & 2(LT1 + RT1)/2 - (LT2 + RT2)/2LA1>400 && RA1>400 && LA2>400 && RA2>4000.55Small statistic
2 & 3(LT2 + RT2)/2 - (LT3 + RT3)/2LA2>400 && RA2>400 && LA3>400 && RA3>4000.79Small statistic
3 & 4(LT3 + RT3)/2 - (LT4 + RT4)/2LA3>400 && RA3>400 && LA4>400 && RA4>4000.50
4 & 5(LT4 + RT4)/2 - (LT5 + RT5)/2LA4>400 && RA4>400 && LA5>400 && RA5>4000.57
5 & 6(LT5 + RT5)/2 - (LT6 + RT6)/2LA5>400 && RA5>400 && LA6>400 && RA6>4000.45
6 & 7(LT6 + RT6)/2 - (LT7 + RT7)/2LA6>400 && RA6>400 && LA7>400 && RA7>4000.51
7 & 8(LT7 + RT7)/2 - (LT8 + RT8)/2LA7>400 && RA7>400 && LA8>400 && RA8>4000.66
8 & 9(LT8 + RT8)/2 - (LT9 + RT9)/2LA8>400 && RA8>400 && LA9>400 && RA9>4000.62
9 & 10(LT9 + RT9)/2 - (LT10 + RT10)/2LA9>400 && RA9>400 && LA10>400 && RA10>4000.62
10 & 11(LT10 + RT10)/2 - (LT11 + RT11)/2LA10>400 && RA10>400 && LA11>400 && RA11>4000.49
11 & 12(LT11 + RT11)/2 - (LT12 + RT12)/2LA11>400 && RA11>400 && LA12>400 && RA12>4000.44
12 & 13(LT12 + RT12)/2 - (LT13 + RT13)/2LA12>400 && RA12>400 && LA13>400 && RA13>4000.50




04 Mar 2006