24 Feb 2006


Following changes to trigger was made:

1. The BigBite trigger is now just the Shower Sum. The Shower Sum goes
directly to the Total Shower Sum skipping the AND with the Preshower sum.
To compensate for this change 8ns cable was added after the Total shower
sum.

2. Remove the pulser from BigBite trigger and Neutron Arm Trigger.


25 Feb 2006


First time we have beam.
Electron trigger(T2) rates dependence to BB Total Sum(TS) threshold values was measured, based on run 2195.

Current: 5uA

Threshold (mV / MeV)20 / 10040 / 20060 / 300
Rate (Hz)1.014 *1065.980 *1041.830 *104


Current: 2uA

Threshold (mV / MeV)60 / 30080 / 400
Rate (Hz)74302800


Current: 10uA

Threshold (mV / MeV)80 / 400100 / 500120 / 600
Rate (Hz)1.5 *10462002700



26-27 Feb 2006

DC VME crates was changet to FastBus? crates.


28 Feb 2006


BB HV was adjasted using run 2429.
HV setting before adjastment:
/w/work3503/e02013/GEn/adaq.bk/adev/slowc/HV_BB/hv_set/bb_hv_28_02_2006_adj.set

Hv settings after adjastment:
/w/work3503/e02013/GEn/adaq.bk/adev/slowc/HV_BB/hv_set/bb_hv_28_02_2006_adj2429.set

Adjastment factors based on run 2429:
/w/work3503/e02013/GEn/adaq.bk/adev/slowc/scripts/adj_sh_2429.dat - for Shower.
/adj_ps_l_2429.dat - for left PS.
/adj_ps_r_2429.dat - for right PS.


Mean elastic scattering energy (860 MeV) was used for calibration.


01 Mar 2006


Background rate calculation for different beam positions.



Run #TargetCurrent (uA)Time (sec)AxAyBxByRate (Hz)Rate per uA (Hz/uA)
2461Reff cell empty1.194290-0.221-1.451-0.352-0.7510.3280.275
2462Reff cell empty5.217330-0.318-1.599-0.387-0.8641.8820.361
2463Reff cell empty0.625325-0.274-1.333-1.493 0.4780.1850.296
2464Reff cell empty0.629295-0.240-1.433-1.559-2.8260.2340.372
2465Reff cell empty0.628305-0.263-1.297 0.880-0.9200.2620.417
2466Reff cell empty0.558300-0.281-1.325 0.926 0.3900.3570.640



02 Mar 2006


Counting rates was calculated for Vacuum, HE3 and H2 targets, both for electrond and pions.
Based on runs 2461, 2473 and 2485.

Run #TargetCurrent (uA)Time (sec)AxAyBxByElectrons rate per uA (Hz/uA)Pions rate per uA (Hz/uA)
2461Vacuum1.194290-0.221-1.451-0.352-0.7510.2750.436
2473He31.1921837-0.215-1.639-0.347-0.8174.5513.194
2485H22.1451826-0.268-1.659-0.354-0.8094.4162.994





03 Mar 2006


BB Scintillators time resolution study.

For scintillators 5 and 6 was ploted following distribution:

(LT5 + RT5)/2 - (LT6 + RT6)/2, where
LT - left PMT time, RT - right PMT time, numerical index - scintilator bar number.
Sigma for this distribution was 1.48ns.


Then same distribution was ploted with cut on scintillators amplitude value:
LA5>400 && RA5>400 && LA6>400 && RA6>400, where
LA - left PMT amplitude, RA - right PMT amplitude, numerical index - scintilator bar number.
Sigma for this distribution was 0.45ns.

Same calculations was made form all scintillator bars, combined into pairs:
1&2, 2&3, 3$4 ... 11&12, 12&13.


Scintillator barsDistributionCutsSigmaComment
1 & 2(LT1 + RT1)/2 - (LT2 + RT2)/2LA1>400 && RA1>400 && LA2>400 && RA2>4000.55Small statistic
2 & 3(LT2 + RT2)/2 - (LT3 + RT3)/2LA2>400 && RA2>400 && LA3>400 && RA3>4000.79Small statistic
3 & 4(LT3 + RT3)/2 - (LT4 + RT4)/2LA3>400 && RA3>400 && LA4>400 && RA4>4000.50
4 & 5(LT4 + RT4)/2 - (LT5 + RT5)/2LA4>400 && RA4>400 && LA5>400 && RA5>4000.57
5 & 6(LT5 + RT5)/2 - (LT6 + RT6)/2LA5>400 && RA5>400 && LA6>400 && RA6>4000.45
6 & 7(LT6 + RT6)/2 - (LT7 + RT7)/2LA6>400 && RA6>400 && LA7>400 && RA7>4000.51
7 & 8(LT7 + RT7)/2 - (LT8 + RT8)/2LA7>400 && RA7>400 && LA8>400 && RA8>4000.66
8 & 9(LT8 + RT8)/2 - (LT9 + RT9)/2LA8>400 && RA8>400 && LA9>400 && RA9>4000.62
9 & 10(LT9 + RT9)/2 - (LT10 + RT10)/2LA9>400 && RA9>400 && LA10>400 && RA10>4000.62
10 & 11(LT10 + RT10)/2 - (LT11 + RT11)/2LA10>400 && RA10>400 && LA11>400 && RA11>4000.49
11 & 12(LT11 + RT11)/2 - (LT12 + RT12)/2LA11>400 && RA11>400 && LA12>400 && RA12>4000.44
12 & 13(LT12 + RT12)/2 - (LT13 + RT13)/2LA12>400 && RA12>400 && LA13>400 && RA13>4000.50



04-08 Mar 2006

Taking production runs on 1-st kinematics.


08 Mar 2006


Found out that signal from PS modules goes to ADC after 10X amplifier, Shower signal goes through summator, which amplification factor is 5x. Therefore in calibration program should be used PS amplitudes values divided by factor 2.

Starting second kinematics. Delays on trigger was changed.

1" acrylic shielding was installed on the front face of chamber 3 and a wall of plastic and aluminum was installed on the right side (facing detectors from target).


09 Mar 2006

Shower and Preshower HV has been changed to old - cosmic calibrated values.

HV setting file:
/w/work3503/e02013/GEn/adaq.bk/adev/slowc/HV_BB/hv_set/bb_hv_28_02_2006_adj.set


10 Mar 2006

Shower X and Y position finding algorithm in analyzer was changed.
Before it we used

X = xiei / E,
where xi and ei is x-position and deposited energy of i-th block of the cluster.

Now X and Y position is X and Y position of central block of cluster.


11 Mar 2006


Starting PS calibration based on pion peak position.