E94-107 Shift Checklist

Date and Time
          
          
          
          
          
Your Name
 
 
 
 
 
Beam Energy (GeV)
 
 
 
 
 
Beam Energy Lock  on?          
Beam Current (µA)          
Spot x×y (mm)
 
 
 
 
 
BPMB x/y (< 0.3 mm) 
 
 
 
 
 
Fast FB ON?           
Argon Pres.(PSI)
  
       
Ethane Pres.(PSI)          
CO2 Pres.(PSI)          
RIGHT  VDC Gas Flow(T/B)
 
 
 
 
 
LEFT VDC Gas Flow(T/B)          
RIGHT VDC HV(T/B)
 
 
 
 
 
LEFT VDC HV(T/B)          
RIGHT Septum (A)
  
  
  
  
  
RIGHT Quad #1 (T/A)
  
  
  
  
  
RIGHT Quad #2 (T/A)          
RIGHT Dipole (T/A)           
RIGHT Quad #3 (T/A)          
LEFT Septum (A)
  
  
  
  
  
LEFT Quad #1 (T/A)
 
       
LEFT Quad #2 (T/A)          
LEFT Dipole (T/A)          
LEFT Quad #3 (T/A)          
(To be continued)






E94107 Shift Checklist

(Continued)
RIGHT Cryo Level OK?
(He>60%,N>25%) 
          
          
          
          
          
LEFT Cryo Level OK?
(He>60%, N>25%)
         
RIGHT S1 HV OK? 
 
 
 
 
 
RIGHT S2 HV OK?          
RIGHT GAS C HV OK?          
RIGHT Preshower HV OK?           
RIGHT Shower HV OK?           
LEFT S1 HV OK?
 
 
 
 
 
LEFT S2 HV OK?          
LEFT A1 HV OK?          
LEFT A2 HV OK?          
Target
 
 
 
 
 
RICH gas flow OK?          
RICH HV OK?          
RICH power supply OK?          
Latest Run Number
 
       
Computer Deadtime
 
       
Prescales 1/2/3/4/5/6/7
 
 
 
 
 
Event Rates 1/2/3/4/5/6/7  
 
 
 
 
Waterfall Target pump speed:          
Visual Hall Inspection OK?
 
 
 
 
 

 
 
 
 
 
 
 
 

Privacy and Security Notice