Notes from Local Meeting on March 25, 2004
In attendance: Hachemi Benaoum, Rob Feuerbach, Doug Higinbotham,
Tim Holmstrom, Lisa Kaufman, Bob Michaels, Bryan Moffit, Kent Paschke,
Ryan Snyder, Riad Suleiman
-
General Notes
- Optics Targets
- 9 foil was installed, will remove 2 of them.
- Want a setup where we have 3 foils (+/-5cm, and 0)
- Also need aluminum foils at +/- 10cm. May need to modify
their thickness to better approximate the production targets.
- Surveying (of target, septum, BPMs/Harps)
- Needed to double check pointing measurement. Will probably
need to be requested, if not already.
- Left Septum may need to be re-surveyed, since it was moved
to be repaired.
- Some investigation needs to be done regarding the location
of the septum bore in space.
- Acceptance defining collimators
- Some discussion needs to be done with Paul Souder. Will
probably end up having wide collimation to prevent loss of rate.
- Detector Supports
- Have been redesigned.
- To install, must remove S1, A1 and A2 on Left Arm.
- Summer Students
- Two will arrive from UMass... and are looking for a place
to stay. Contact Kent.
-
Lumi Status (Bob, Hachemi, Riad)
- Finished the fabrication of the two Target Lumi. Still need
to check the planned positions to make sure they're in the line of
sight of the target, and avoid the collimators. The stands are being
constructed in the Machine Shop.
- BLumi3 is still showing some unstable pedestals. Still
investigating.
- Should probably reconnect the current battery close to the
BLumi, if possible.
-
Laser Room Studies (Lisa)
- Working on setup to minimize steering in the Arwen Cell by
finding its geometric center.
- Scans to be done to find this center using position
translators. A software utility has been written in order to take care
of this quickly. So far, it's setup for the laser room DAQ.. and should
be easy to integrate into the HAPPEX DAQ.
-
GDH Analysis (Ryan)
- Lots of plots have been made. Almost done.
-
Imaging Studies (Ryan)
- Investigating it's feasability. There may be a problem in
finding the right types of lenses (quite limitted by the amount of
space available on the laser table).
- Needs to be prototyped.
-
DAQ Status (Bryan)
- Two ADCs (from UMass) have been recovered. Need to determine
where we need them, and what gains to give them.
- Working on turning the onlineGUI into an online Monitor
- Will be the expert of the software implementation of HC
Position/Intensity Feedback.
-
General Source (Kent)
- Need to study the IA System before it's reinstalled in
mid-April (for Hypernuclei). There is some question on whether we
should use the IA System, or just use PITA Feedback.
- Accelerator group is anxious to use the new SuperLattice
Cathode. Need to prototype the laser table setup in the laser room in
order to check the effect of the extra reflections need to get to Gun
3. Not anticipating large sensitivities.
- Phase Trombone: some discussion with accelerator group this
week. Some design work may need to be done to constrain the beam phase
space by using more quads. Software design may start this week, and we
should have it available by mid-April.
Bryan Moffit
Last modified: Thu Apr 1 02:40:14 EST 2004