HAPPEX How To Page

last updated: August 17 2005


HAPPEX Data Acquisition


HAPPEX DAQ cold start

Note: This is for HAPPEX DAQ. If you want to cold start spectrometer DAQ see Spectrometer DAQ cold start.

Top of page

Monitoring HAPPEX systems

Top of page

Rebooting HAPPEX crates

Top of page

Running CODA for HAPPEX DAQ

Note: This is for HAPPEX DAQ. If you want to run CODA for spectrometer DAQ see Running CODA for spectrometer DAQ.

Top of page

HAPPEX Data Analysis


Online Data Monitor

Top of page

Starting prompt analysis

Top of page

Spectrometer


Bringing up the Alarm Handler

Top of page

Bringing up the HAC control window

Top of page

Changing momentum setting of HRS and Septum


Reset Q1 of Left or Right HRS

This is for Q1 recovery after it trips. Never use the following instruction if Q1 works fine.
Top of page

Target


Checking target temperature


New Procedure on target IOC reboot

On August 11th, 2005, target IOC was removed from the hall to the labyrinth hallway. The following procedure should be followed when the target IOC needs to be rebooted:
Top of page

Spectrometer Data Acquisition


Spectrometer DAQ cold start

Note: This is for spectrometer DAQ. If you want to cold start HAPPEX DAQ see HAPPEX DAQ cold start.

Top of page

Mapping of ROCs to Portserver and IP for Spectr. DAQ


        HRS-DAQ CODA Configrations 

        TWOARM             Two spectrometers
        pedrun             Pedestal run for TWOARM

HRS-DAQ crates     (accurate as of July 8, 2005)
  ROC       Description      IP Address   Portserver
  ROC1     R-arm Lower Fastbus Crate   hallasfi1     hatsv3 port 2  
  ROC2     R-arm Upper Fastbus Crate   hallasfi2     hatsv3 port 8  
  ROC3     L-arm Lower Fastbus Crate   hallasfi3     hatsv4 port 3  
  ROC4     L-arm Upper Fastbus Crate   hallasfi4     hatsv4 port 2  
  TS0     R-arm VME/Scaler   hallavme2     hatsv3 port 3  
  TS1     L-arm VME/Scaler   hallavme4     hatsv4 port 14  
  ROC7   (Dropped)     F1 TDC Crate   hallavme17     hatsv4 port 10  
ROC7 will probably remain dropped, at least for the start of the run; it is not necessary.

Top of page

Triggers for HAPPEX

We will sometimes run the spectrometer DAQ for optics, alignment check, Q2 measurement, background studies, etc.

Here are the triggers:

T1,T2,T5,T7 are on R-arm.
T3,T4,T6,T8 are on L-arm.
Top of page

Rebooting HRS crates

Top of page

Running CODA on Spectrometer DAQ

Note: This is for spectrometer DAQ. If you want to run CODA for HAPPEX DAQ see Running CODA for HAPPEX DAQ.

Top of page

Starting xscaler (HRS) and checking trigger rate

Top of page

Spectrometer Data Analysis


Analysis for Spectrometer DAQ data

We will do infrequent spectrometer-DAQ runs for the following purposes:

Important: Use the checklist when switching between spectrometer and HAPPEX DAQs.

Instructions for online checks:

Top of page

Hall A Detectors


List of Detectors

Top of page

Detector High Voltages

VDC check and high voltage

Top of page

Helicity Controls


Changing the Half Wave Plate

To change the state of the insertable half-wave plate (IHWP):
  1. End the current HAPPEX run and the current Compton Run.
  2. Call MCC and ask them to change the state of the Insertable Half-Wave Plate (IHWP) from In to Out or Out to In as appropriate.
  3. When you see the state of the IHWP change in the HAPPEX feedback monitor, type in an xterm (logged in as apar):
         flipper
  4. The new setpoints should now appear in the HAPPEX feedback monitor.. the Rotatable Half-wave Plate (RHWP) takes a minute or two to change (so be patient!).
       DO NOT START A NEW RUN UNTIL YOU HAVE VERIFIED THE NEW SETPOINTS.
  5. Start a new HAPPEX run and a new Compton Run.
  6. Make a halog entry, saying you've changed the IHWP, and include a screen capture of the HAPPEX feedback monitor (the "runbird" GUI).
  7. Write the new half-wave plate configuration on the white board.

Below is a sample of what the output looks like (from flipper).

Top of page

Miscellaneous


Bringing up the Beamtime Counting Table

Top of page

Plotting time dependences of EPICS variables

Top of page

Printing in the counting house

Top of page

Starting HALOG

Top of page

Starting spot++ and checking the raster

Top of page

Other Problems


If you can't solve a problem

Top of page

HAPPEX Home


Rich Holmes, Last modified: Fri Jul 29 12:21:09 EDT 2005