Runlist for HAPPEX-He (Beginning June 7, 2004) Run # Target IHWP Analyzed Comments ------------------------------------------------------------- Runs from Polarized Source Install ------------------------------------ 1916 OUT x Pedestal run for QPD 1917 OUT x Checking QPD pedestals 1919 OUT x Recheck QPD pedestals 1920 OUT x QPD X calibration scan 1921 OUT x QPD Y calibration scan 1922 OUT x Pockels cell X steering scan, scaler0_3 cable went bad 1923 OUT x PITA scan, scaler0_3 cable bad 1924 OUT x Pockels cell Y steering scan, scaler0_3 cable bad 1925 OUT x QPD pedestal run 1926 OUT x Pockels cell Y steering scan 1927 OUT x PITA scan 1928 OUT x Pockels cell X steering scan 1929 OUT x Pockels cell Y steering scan 1930 OUT x Pockels cell X steering scan 1931 OUT x Pockels cell Y steering scan 1932 OUT x Pockels cell centering scan 1933 OUT x Pockels cell centering scan 1934 OUT x rough centering of QPD 1935 OUT x QPD X calibration 1936 OUT x QPD Y calibration 1937 OUT x PITA scan 1938 OUT x Pockels cell X birefringence scan 1939 OUT x Pockels cell Y birefringence scan 1940 OUT x Measuring birefringence 1941 IN x forgot to change to IHWP IN Pockels cell voltages 1942 IN x Measure position differences 1943 OUT x rough centering of QPD 1944 OUT x QPD X calibration scan 1945 OUT x QPD Y calibration scan 1946 OUT x PITA scan 1947 OUT x PZT X scan 1948 OUT x PZT Y scan 1949 OUT x IA cell scan 1950 IN x PITA scan 1951 IN x Measure position differences 1952 IN x RHWP scan 1953 OUT x RHWP scan 1954 OUT x Measure position differences 1958 OUT x Beamline config, taking data in 100keV region, PITA scan 1959 OUT x RHWP scan, but ended early 1970 OUT x Optics, 5uA, no Ia fdbk 1971 OUT x Optics, 5uA, no Ia fdbk 1972 OUT x Optics, 5uA, no Ia fdbk 1973 OUT x Optics, 5uA, no Ia fdbk 1974 OUT x Optics, 5uA, no Ia fdbk 1975 OUT x Optics, 5uA, no Ia fdbk 1976 OUT x Optics, 5uA, no Ia fdbk 1977 OUT x Optics, 5uA, no Ia fdbk 1978 OUT x Optics, 5uA, no Ia fdbk 1979 OUT x Optics, 5uA, no Ia fdbk 1980 OUT x Optics, 5uA, no Ia fdbk 1981 OUT x Optics, 5uA, no Ia fdbk 1982 OUT x Optics, 5uA, no Ia fdbk 1983 OUT x Optics, 5uA, no Ia fdbk 1984 OUT x Optics, 5uA, no Ia fdbk 1992 OUT x check beam 1993 OUT x BCM/BPM calibration run 1994 OUT x PITA scan 1995 OUT x charge asymmetry check 1996 OUT x IA scan 1997 OUT x RHWP scan 1998 OUT x test feedback, RHWP = 15 deg. 1999 OUT x test feedback, RHWP = 15 deg. 2000 OUT x run for detector studies 2001 OUT x run for dectector studies, no data with bcm3 2002 OUT x detector studies, no data with bcm3 2003 OUT x detector studies, no data with bcm3 2004 OUT x detector studies, no data with bcm3 2005 OUT x detector studies, no data with bcm3 2006 OUT x detector studies, no data with bcm3 2007 OUT x detector studies, no data with bcm3 2008 OUT x Sychronization check 2009 OUT x Pedestals and Sync check 2010 OUT x Pedestals and Sync check 2011 OUT x Sync check 2012 OUT x Sync check 2013 OUT x Sync check 2014 OUT x Sync check 2015 OUT x First beam on helium target-- check target and septum 2016 OUT x VDC's off, Integrating mode for detectors 2017 OUT x Watching septa & target; IA feedback off, 10 uA 2018 OUT x Watching septa & target; IA feedback off, 10uA 2019 OUT x Watching septa & target,test fdbk, IA fdbk, 10 uA 2020 OUT x IA fdbk, 10 uA 2021 OUT x IA fdbk, 10 uA 2022 OUT x IA fdbk, 10 uA 2023 OUT x IA fdbk, 10 uA 2024 OUT x IA fdbk, 10 uA 2025 OUT x IA fdbk, 10 uA 2026 OUT x no beam, junk 2027 OUT x no beam, junk 2028 OUT x no beam, junk 2029 OUT x no beam, junk 2030 OUT x 2031 OUT 2032 OUT IA feedback, 10 uA 2033 OUT IA fdbk, 8 uA 2034 OUT IA fdbk, 8 uA 2035 OUT no beam 2036 OUT 2037 OUT 7 uA 2038 OUT no beam 2039 OUT no beam 2040 OUT 2041 OUT ,IA fdbk off 2042 OUT 2043 OUT wrong optics-->momentum setting off 2044 OUT wrong optics-->momentum setting off 2045 OUT wrong optics-->momentum setting off 2046 OUT wrong optics-->momentum setting off 2047 OUT wrong optics-->momentum setting off 2048 OUT wrong optics-->momentum setting off 2049 OUT wrong optics-->momentum setting off 2050 OUT 2051 OUT 2052 OUT 2053 OUT 2054 OUT 2055 OUT 2056 OUT 2057 OUT 2058 OUT 2059 OUT 2060 OUT 2061 OUT 8 uA 2062 OUT 2063 OUT Carbon target 30uA 2064 OUT Carbon target 10uA 2065 OUT Carbon target 70-->100uA 2067 OUT 12cm optics targwet 2068 OUT Pedestal run 2069 OUT Prod., 28uA 2070 OUT Dithering Test 2071 OUT Prod., 28uA 2072 OUT HWP scan, 28uA 2073 OUT PITA scan 2074 OUT PITA scan 2075 OUT PITA scan 2076 OUT ? 2077 OUT IA scan 2078 OUT PZT X scan 2079 OUT PZT Y scan 2080 OUT ? 2081 OUT x back to 4x4 raster 2082 OUT x .... Pedestal Runs (2082-2089) 2089 OUT 2090 OUT Beam modulation run 2091 OUT x Production run 2092 OUT x Prod. 2093 OUT x Prod. 2094 OUT x Prod. 2095 OUT x Beam modulation run 2096 OUT x Prod. 2097 OUT x Prod. 2098 OUT x Beam modulation run 2099 OUT x Prod. 2100 OUT x Prod. 2101 OUT x Pedestal run 2102 skipped, there is no .db file here (logbook says problem with DAQ) 2103 OUT x Dithering, no beam at start 2104 OUT x dummy target at 30 uA 2105 OUT x Prod. -->4He 2106 OUT x Prod. 2107 OUT x Pedestal Runs (2107-2117) 2118 OUT x Scanner position calibration 2119 OUT x Scanner position calibration 2120 OUT x check width with 1x1 mm true raster 2121 OUT x check width with 3.5x3.6 true raster 2122 OUT x check width with 3.5x3.6 true raster and differnet target temp. 2123 OUT x check with 1x1 mm true raster and new target 2124 OUT junk 2125 OUT x Dithering 2126 OUT x Compton tuning 2127 OUT x no comment for this run 2128 OUT x Dithering 2129 OUT x Prod. 2130 OUT x Prod. 2131 OUT x Prod. 2132 OUT x Prod. (left septum not properly set) 2133 OUT x Dithering 2134 OUT x Dithering 2135 junk--forgot to turn feedback off to do PITA 2136 OUT x PITA scan 2137 OUT x IA scan 2138 OUT x IA scan 2139 OUT x scanner commissioning run 2140 OUT x scanner commissioning run 2141 OUT x scanner commissioning run 2142 OUT x test run 2143 OUT x Profile scanner actual scan 2144 OUT x Dithering 2145 OUT x Dithering 2146 OUT x Prod. 2147 OUT x Prod. 2148 OUT junk 2149 OUT x Dithering 2150 OUT junk 2151 OUT x Prod. 2152 OUT x Prod. 2153 OUT x Prod. 2154 OUT Prod. 2155 OUT x Dithering 2156 OUT Prod. 2157 OUT Prod. 2158 OUT x Prod. 2159 OUT x Dithering 2160 OUT x Prod. 2161 OUT x Dithering 2164 OUT Production 2168 OUT Dithering 2169 OUT Production Both septa tripped during the run 2170 OUT BCM calibration Carbon target 2171 OUT BCM calibration Carbon target 2172 OUT Carbon target Blumi data 2173 OUT Production No left septa after event # 72500 2174 OUT Production Right septa only 2175 OUT Production 2176 OUT Production 2179 OUT PITA scan empty target .... 2183 OUT PITA scan empty target 2185 OUT IA scan, Empty Target 2186 OUT Production .... 2189 OUT Production 2190 OUT Production, Q1 trip at the end 2191 OUT Pedestal Run 2193 OUT Pedestal Run 2194 OUT Pedestal Run 2195 OUT Pedestal Run 2196 OUT Production, Left Septum down. 2197 OUT Production, Stopped for beam E modulation. 2198 OUT Dithering, after 22k. 2199 OUT Production 2201 OUT Production 2202 OUT Production 2203 OUT Dithering 2204 OUT Production 2209 OUT Production 2210 OUT Production 2211 OUT Production 2212 OUT Dithering, Energy didn't cycled. 2213 OUT Production 2214 OUT Dithering 2215 OUT Production 2216 OUT Production 2217 OUT Pedestal Run. .... 2225 OUT Pedestal Run. 2226 OUT Production 2227 OUT Production 2228 OUT Production 2229 OUT PITA 2232 OUT PITA 2233 OUT Production ... 2236 OUT Production 2237 OUT Production 2238 OUT Production 2239 OUT Production 2240 OUT Production 2241 OUT Production 2242 OUT Production 2243 OUT Production 2244 OUT Production 2245 OUT Production 2246 OUT Pedestal Run 2247 OUT Pedestal Run 2248 OUT Pedestal Run 2249 OUT Production 2250 OUT background run 2251 OUT background run 2252 OUT PITA scan, feedback not turned off 2253 OUT PITA scan 2254 OUT PITA scan 2255 OUT Production 2256 OUT Production 2257 OUT Production 2258 OUT Pedestal Run 2259 OUT Pedestal Run 2260 OUT Pedestal Run 2261 OUT Production (but commented as pedestal) 2262 OUT Production 2263 OUT Production 2264 OUT Production 2265 OUT Production 2266 OUT Pedestal Run 2267 OUT Production 2268 OUT Production 2269 OUT Production 2270 OUT Production 2271 OUT Production 2272 OUT Production 2273 OUT Pedestal Run 2274 OUT Pedestal Run 2275 OUT Pedestal Run 2276 OUT Pedestal Run 2277 OUT Profile Scan at 54 deg (high voltage off!) 2278 OUT Production 2279 OUT Pedestal Run 2280 OUT Production 2281 OUT Production 2282 IN PITA scan 2283 IN PITA scan 2284 IN Production 2285 IN Production 2286 IN Production 2287 IN Production 2288 IN Profile Scan at 54 deg (NO BEAM) 2289 IN Profile Scan at 54 deg 2290 IN Production 2291 IN Production 2292 IN Production 2293 IN Production 2294 IN DAQ problems--> no data 2295 IN DAQ problems--> no data 2296 IN DAQ problems--> no data 2297 IN DAQ problems--> very little data 2298 IN Production 2299 IN Production 2300 IN Production 2301 IN Production 2302 IN Production 2303 IN Production 2304 IN Production 2305 IN Production 2306 IN Production 2307 IN Production 2308 IN Production 2309 IN Production 2310 IN Production 2311 IN Production 2312 IN Production-->very little data 2313 IN Production 2314 IN Production 2315 IN X-Y scan(0,0) 2316 IN X-Y scan(0,0) 2317 IN X-Y scan(-3,0) 2318 IN X-Y scan(3,0) 2319 IN X-Y scan(2.4,0) 2320 OUT check A_q, correct with PITA 2321 OUT Production 2322 OUT Production-->very little data 2323 OUT Both septum off... test feedback code 2324 OUT Both septum off... test feedback code 2325 OUT Production--> left septum current ramping 2326 OUT Production--> left septum current ramping 2327 OUT Production--> both septums back 2328 OUT Beam studies, pedestal run 2329 OUT Beam studies, pedestal run 2330 OUT Beam studies, pedestal run 2331 OUT Beam studies, pedestal run 2332 OUT pedestal run 2333 OUT pedestal run, oversample = 12(13) 2334 OUT pedestal run (no beam) 2335 OUT 5 uA boiling/septum study 2336 OUT 10 uA boiling/septum study 2337 OUT 20 uA boiling/septum study 2338 OUT 20 uA boiling/septum study 2339 OUT 20 uA boiling/septum study 2340 OUT 30 uA boiling/septum study 2341 OUT 30 uA boiling/septum study 2342 OUT 30 uA boiling/septum study 2343 OUT 30 uA boiling/septum study 2344 OUT 30 uA boiling/septum study 2345 OUT 30 uA boiling/septum study 2346 OUT 30 uA boiling/septum study 2347 OUT 30 uA boiling/septum study 2348 OUT 35 uA boiling/septum study 2349 OUT 40 uA boiling/septum study 2350 OUT 45 uA boiling/septum study 2351 OUT 45 uA boiling/septum study 2352 OUT 50 uA boiling/septum study 2353 OUT 50 uA boiling/septum study 2354 OUT 50 uA boiling/septum study 2355 OUT 60 uA boiling/septum study 2356 OUT 52 uA boiling/septum study 2357 OUT Production--> left septum ramping 2358 OUT Production-->both arms running 2359 OUT Production 2360 OUT Production 2361 OUT Production 2362 OUT Production 2363 OUT Production 2364 OUT Production 2365 OUT Production 2366 OUT 4He target at 2 atm 2367 OUT 20 cm dummy asymmetry measurement 2368 OUT 20 cm dummy asymmetry measurement (HV increased L=1650, R=1600) 2369 OUT 20 cm dummy asymmetry measurement (HV L=1650, R=1600) 2370 OUT pedestal run ---------------------Start switch to Hydrogen------------------------------------------------------------------------- 2371 OUT injector studies, 40 uA in 100 keV 2372 OUT injector studies, 50 uA in 100 keV, PITA scan 2373 OUT injector studies, 50 uA in 100 keV 2374 OUT injector studies, 50 uA in 100 keV, RHWP scan 2375 OUT injector studies, 50 uA in 100 keV, RHWP scan with PITA =+100V 2376 IN injector studies, 50 uA in 100 keV, PITA scan 2377 IN injector studies, 50 uA in 100 keV, RHWP scan 2378 IN sync check 2379 IN scanner positions calibration 2380 IN scanner positions calibration 2381 IN scanner positions calibration 2382 IN scanner positions calibration 2383 IN scanner positions calibration, and detector pedestal check 2384 IN scanner positions calibration, and detector pedestal check 2385 IN detector pedestal check 2386 IN first current on LH2 2387 IN 5 uA on LH2 2388 IN 5 uA on LH2, low current production 2389 IN ramping current, checking HV 2390 IN checking HV 2391 IN Production; 20 uA 2392 IN fan speed scan, raster 3.5x3.5 2393 IN fan speed scan, raseter 1x1, 20 uA 2394 IN Production, 30 uA 2395 IN fan speed scan, 30 uA, 3.5x3.5 raster 2396 IN Production, 30 uA 2397 IN Production, 30 uA 2398 IN Production, 30 uA 2399 IN pedestal, no beam 2400 IN Production in Right arm 2401 IN Production 2505 OUT Not production, checklist not completed 2506 OUT Not production, checklist not completed 2507 OUT first run at 40 uA, adjust HV 2508 OUT Production, 40 uA 2509 OUT profile scan 2510 OUT profile scan 2511 OUT Production, 38 uA 2512 OUT Production, 38 uA 2513 OUT Production, 38 uA 2514 OUT Production, 38 uA 2515 OUT Production, 38 uA 2516 IN Production, 38 uA 2517 IN Production, 38 uA 2518 IN Production, 38 uA 2519 IN Production, 38 uA 2520 IN profile scan 2521 OUT Production, 38 uA 2522 OUT Production, 38 uA 2523 OUT Production, 35 uA 2524 OUT Production, 33 uA 2525 IN Production, 31 uA 2526 IN Production, 30 uA 2531 IN Production, 38 uA 2532 IN Current Calibration, Various uA 2533 IN Production, 38 uA 2534 IN Production, 38 uA 2535 OUT Production, 38 uA 2536 OUT Production, 38 uA 2537 OUT Profile calibration scan, no beam 2538 OUT Production 38 ua, Rt. septum tripped; Left arm only second half of run 2539 OUT Production, 38 uA--> Left arm only 2540 OUT Production, 38 uA--> Left arm only 2541 OUT profile scan, Left arm only 2542 OUT Production, 38 uA--> Left arm only 2543 OUT Production, 35 uA--> Both arms 2544 IN Production, 35 uA 2545 IN Production, 31 uA--> only 20k events 2546 IN junk, disk space problem 2547 IN junk, disk space problem 2548 IN junk, DAQ problem 2549 IN junk, DAQ problem 2550 IN Production, 27 uA 2551 IN Production, 32 uA 2552 IN Production, 25 uA 2553 OUT Production, 23 uA 2554 OUT Production, 38 uA 2555 OUT Production, 38 uA 2556 OUT Production, end run due to laser prob 2557 OUT Production, 38 uA 2558 OUT One minutes short run 2559 OUT Production, 38 uA 2562 IN Production, 27 uA 2563 IN Production, 26 uA 2564 IN Junk, harp scan during the last 10 minutes of run 2565 IN Production, 26 uA, 32K events, ended for spot move 2566 IN Production, 34 uA 2567 IN Production, 34 uA 2568 OUT Production, 35 uA 2569 OUT Production, 35 uA 2570 OUT Production, 35 uA, kcoda at the end to fix the feedback redbox alarm 2571 OUT junk, right Q2 & Q3 problem, no septum 2572 OUT junk, no septum 2574 OUT Production, 35 uA 2575 IN Production, 34 uA 2576 IN Lost septum control, short run 2577 IN Production, 34 uA 2578 IN Production, 34 uA 2579 IN Production, 34 uA 2580 IN Production, 34 uA 2582 OUT Production, 35 uA 2583 OUT Production, 35 uA 2584 OUT Very short production run 2585 OUT profile scan 2586 OUT profile scan 2587 OUT Production, 35 uA 2588 OUT Production, 35 uA, Septa flattened during this run 2589 IN Test, 35 uA, (+0.2%, 0%), profile scan, Septa flattened 2590 IN Test, 35 uA, (+0.2%, 0%), junk 2590 IN Test, 35 uA, (+0.2%, 0%), profile scan, Septa flattened 2594 IN Test, 35 uA, (+0.2%, 0%), profile scan, dithering off, a good one! 2595 IN Test, 35 uA, (+0.2%, 0%), dithering test, 5 min only, stopped for MCC test 2596 IN Test, 35 uA, (+0.2%, 0%), dithering test, last 10 min had good beam 2597 IN Test, 35 uA, (+0.0%,-1%), profile scan, dithering off 2598 IN Test, 35 uA, (+0.0%,-1%), dithering on 2599 IN Test, 35 uA, (+0.0%,+1%), profile scan, dithering off 2600 IN Test, 35 uA, (+0.0%,+1%), dithering on 2601 IN Test, 35 uA, (-0.2%, 0%), profile scan, dithering off 2602 IN Test, 35 uA, (-0.2%, 0%), dithering on After July 4 Down Runs I don't know about, then during my shift: 2800 OUT Production (looks like first half of run didn't have beam) 2801 OUT Profile scan, but no HV on PMTs 2802 OUT Profile scan 2803 OUT Production 2804 OUT Production 2805 OUT Production 2806 OUT Production 2807 IN junk - run was started before running flipper 2808 IN Production XXXXXXXXXXX FIX ME some runs are missing here !!!!! XXXXXXXXXXX 2882 IN vertical spin Production, Enrgy FastFeedback trouble 2883 OUT vertical spin Production, 2884 IN vertical spin Production, Compton work in parallel 2885 OUT vertical spin Production 2886 IN vertical spin Production 2887 IN vertical spin Production 2888 OUT vertical spin Production 2889 IN vertical spin Production XXXXXXXXXXX FIX ME some runs are missing here !!!!! XXXXXXXXXXX 2903 IN production, 50k events (30min) 2904 IN production 35k events (20min) 2905 IN production 100k events, energy feedback in stdby at the end 2906 IN production 100k events 2907 OUT production 53k events, notice ROC25&26 bad, "reset" CODA since endrun fails; cycled power on network 192 (Hall A access) 2908 OUT production 100k events, with some pedastal (no beam) 2909 OUT pedastal 30k events, (no beam) 2910 OUT production 100k events, at 80k events beam is OFF for rest of run 2911 OUT production 100k events, up to 20k events there is no beam (pedastal), after 20k beam back on for production 2912 OUT production 100k events 2913 OUT production 100k events 2914 OUT production 100k events 2915 IN production 100k events 2916 IN production 100k events 2917 IN profile scan 27.6k events 2918 IN profile scan 21.4k events 2919 IN production 100k events 2920 IN production 20k events, septa RED warning: reboot PLC 2921 IN pedastal 100k events 2922 IN pedestal 2923 IN junk; septa at a wrong setting 2924 IN over-sampling test 2925 IN over-sampling test 2926 IN over-sampling test 2927 IN over-sampling test 2928 IN over-sampling test 2929 OUT production 101k events 2930 OUT production 100k events 2931 OUT production 100k events 2932 OUT production 100k events 2933 IN production 100k events 2934 IN production 101k events 2935 IN production 33k events 2936 IN junk 2937 IN production 100k events, kill beam modulation for about 3min as per MCC request 2938 IN production 100k events 2939 OUT production 100k events 2940 OUT production 100k events 2941 OUT production 100k events 2942 OUT production 100k events 2943 IN production 100k events 2944 IN production 100k events 2945 IN production 100k events, lumi 2,7,8 large width: 5000 rms 2946 IN production 4.5k events, abort run: right septum was tripped during run 2947 IN pedastal 2948 IN pedastal 37k events 2949 IN Hall C IA scan 9.8k, beam in injector only 2950 IN pedestal 100k events 2951 IN pedestal 20k events 2952 IN production 100k events 2953 IN production 100k events, beam modulation stopped 2954 OUT production 100k events 2955 OUT production 100k events 2956 OUT production 100k events 2957 OUT profile scan 38k events 2958 OUT production 100k events 2959 IN production 100k events 2960 IN production 100k events 2961 IN production 100k events 2962 IN production 100k events 2963 OUT production 100k events 2964 OUT production 100k events 2965 OUT production 49k events, at about 30k noticed Feedback Monitor analyzer state red: "No update in over 2min" restart CODA 2966 OUT production 100k events 2967 OUT production 60k events 2968 IN production 100k events 2975 IN production 100k events 2976 IN production 100k events 2977 IN CURRENT RAMP STUDY 2978 IN production 100k events 2979 IN production 100k events 2980 OUT production 37k events (target ioc reboot) 2981 OUT production 100k events 2982 OUT production 2983 OUT production 100k events 2984 OUT production 100k events 2985 IN production 100k events 2986 IN production 100k events 2987 IN production 100k events 2988 IN production 100k events 2989 IN production 100k events (target ioc reboot) 2990 OUT production 100k events 2991 OUT production