3 pass beam | 3 pass beam | 1 pass beam |
--bkgd check --install new detector --check phase advance for dithering -- |
--measure noise at 15Hz --other noise sources? -- -- |
-- -- -- |
(cannot do parasitically) --blinded PMT test -- -- |
(do these during e06007 tests) -- -- -- |
--use VDCs --Switch b/t counting and integrating -- -- |
(do these during e06007 tests) --raster current spot check -- -- |
(maybe do these at 1 pass) --width vs. tgt, I_beam, oversample -- -- |
-- -- -- -- |
(do these during e06007 tests) --determine HV settings --blinded PMT test --dithering run |
-- -- -- -- |
-- -- -- -- |
--transverse asymmetry --cavity/stripline checkout -- -- |