Preshower Tile Test, February 2014

February 26, 2014

This is the first day we try to run the test in the new lab space (also see this pic). Mostly tried to reproduced the earlier result on the LHCb tile. Had to change the PMT HV (increase by 200V), replaced a PMT, etc. But at the end got nearly 22 ph.e. for MIP.

February 27, 2014

First try on the Chinese hexagon tile. For comparison:
    1. 1.5cm thick or 18/32", 12x12cm^2 square;
    2. fiber (Y11) embedded 3.5 turns (nearly 4 turns if including the straight portion);
    3. fiber length about 30cm on either side (see December 2013 record and picture)
    4. single p.e. peak around 26; MIP peak around 541; see russ_tile_20140227_3.5turns.pdf or PNG

February 28, 2014

Test Chinese tile:
    1. reduced fiber to single turns. See pictures: pic1 pic2 pic3;
    2. MIP response: chin_tile_20140228_singleturn.pdf or PNG; Single p.e. at about ch25. Number of p.e. about 8.5 which is what we expected if it is linear with fiber length embedded.

Summary and Next step:

  1. Confirmed 22 p.e./MIP for LHCb tile. Chinese tile performance comparable to LHCb tile. Number of p.e. linear to fiber turns inside the tile.
  2. Will setup COMPASS module, vertically but will be tilted (dark box not tall enough), test MIP response;
  3. Wait for BCF92 fiber and IHEP tiles to come in, test more turns;
  4. Order fiber connectors and study loss;