• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Kelly

    Log entry time 08:02:40 on May28,2000

    Entry number 42179

    keyword=owl shift summary

    Production runs at theta_cm = 50, phi=0
    .
    run........events......comment
    1377.....1.1 M........good
    1378.....1.1 M........good
    1379.....1.1 M
    1380.....1.1 M........boring! (thankfully)
    1381.....1.1 M
    1382.....1.0 M........run end at beam trip; quantum efficiency measurement, ~5min
    1383.....1.1 M
    1384.....1.1 M
    1385.....0.7 M.......stopped to retune cavity with frequent trips
    1386.....1.1 M
    1387......................junk, started by mistake and aborted
    1388......................junk

    0610h: harp scan 911 in conjunction with ndelta run 1389
    0620h: starting pointing reference runs

    1390: 12C pointing (run comment still says harp)

    0635h: pulsed for 10 min

    1391: 15 cm dummy
    1392: 4 cm dummy
    1393: 10 cm dummy

    Changed hadron angle to 50.16 deg (thetacm=50,phi=180). Note that floor
    marks for 50 deg almost invisible, used 49.5.

    0735h: start pointing checks for new angle

    1394: 10 cm dummy. ps3 too large
    1395: 10 cm dummy (hadron angle in run header wrong)
    1396: 15 cm dummy
    1397: 4 cm dummy
    1398: carbon