    16:00 Still waiting for beam.
    21:00 MCC is going to change the Hall A status from controll access to beam
    permit and send the pulsed beam to Hall A. The beam polarization is lower now, 61%
    because they changed the gun with a new one.
    22:21 MCC is ready to send beam to Hall A.
    Change target to LH2 15cm. Reset trigger (T3 ignores aerogel)
    22:54 MCC said the maximum current which can be sent to Hall A is 55uA.
    Ask MCC to send the maximum current to Hall A.

    2330 checked trigger signals with beam. Found that S-ray signal remains
    well centered within aerogel signal.

    Harp 956---Coda 2898 (5uA raster on)

    Time Run Evts Comment
    22:29 2898 0.15M 5uA to 60uA, still tuning the beam.
    23:07 2899 0.52M 63uA, end run to change prescale factors
    23:16 2900 1.6M
    23:45 2901 0.88M