Main INDEX
Monthly INDEX
PREV
NEXT
User name LeRose
Log entry time 12:16:08 on July26,2000
Entry number 47517
keyword=Beam Problems
MCC says they are continuing to have BCM trips which they believe are the result of problems with the BCM sytem itself. They propose running at 20 microamps while they checkout the BCM problems. The hope being that we can get stable operation at 20 mircroamps. Called Doug Higinbotham (run coordinator) and reported the situation to him. He's checking with the PD. Meanwhile we try to take data with 20 microamps.