• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name LeRose

    Log entry time 12:16:08 on July26,2000

    Entry number 47517

    keyword=Beam Problems

    MCC says they are continuing to have BCM trips which they believe are the result of problems with the BCM sytem itself. They propose running at 20 microamps while they checkout the BCM problems. The hope being that we can get stable operation at 20 mircroamps. Called Doug Higinbotham (run coordinator) and reported the situation to him. He's checking with the PD. Meanwhile we try to take data with 20 microamps.