User name LeRose
Log entry time 16:02:54 on July26,2000
Entry number 47525
keyword=Shift summary
Continuing production running ....
Straw efficiency checked for run 3678: OK
07:58 Run 3676 1.18M
08:20.......Run 3677 0.74M stopped for beam off 8:32
(MCC estimates 20 min. They were about right)
08:55 Run 3678 0.89M stopped because beam off more than 5 minutes
(subsequently MCC says they have a path length problem to correct. Estimate 15 minutes)
9:30 Run 3679 0.30M very rocky beam stopped when MCC started sending diagnostic pulsed beam. They're getting lots of BCM trips.
10:21 Run 3680 1.2M No beam for 10 minutes in the middle
10:53 Run 3681 1.2M
11:15 Run 3682 1.2M Rocky beam!
12:09 Run 3683 0.6M Some pulsed beam in the middle of the run, stopped for beam off
13:00-14:00 no useable beam. Continuing BCM problems
14:05 Hall access to repair BCM problem.
15:00 Access continues. Still no beam.
7.93M events 1.9 hrs ABU
total charge 1.037 after run 3683
15:15 Access ends
15:30 Starting to get beam
15:32 Run 3684 1.2M
............................................Total Events this shift 9.13M
............................................Total Charge: 1.07
15:50 Run 3685 started still running at shift end
Beam appears somewhat better, still getting trips (6 in the last 30 minutes)
-JJL