    User name LeRose

    Log entry time 16:02:54 on July26,2000

    Entry number 47525

    keyword=Shift summary



    Continuing production running ....

    Straw efficiency checked for run 3678: OK

    07:58 Run 3676 1.18M
    08:20.......Run 3677 0.74M stopped for beam off 8:32
    (MCC estimates 20 min. They were about right)
    08:55 Run 3678 0.89M stopped because beam off more than 5 minutes
    (subsequently MCC says they have a path length problem to correct. Estimate 15 minutes)
    9:30 Run 3679 0.30M very rocky beam stopped when MCC started sending diagnostic pulsed beam. They're getting lots of BCM trips.
    10:21 Run 3680 1.2M No beam for 10 minutes in the middle
    10:53 Run 3681 1.2M
    11:15 Run 3682 1.2M Rocky beam!
    12:09 Run 3683 0.6M Some pulsed beam in the middle of the run, stopped for beam off
    13:00-14:00 no useable beam. Continuing BCM problems
    14:05 Hall access to repair BCM problem.
    15:00 Access continues. Still no beam.

    7.93M events 1.9 hrs ABU
    total charge 1.037 after run 3683

    15:15 Access ends
    15:30 Starting to get beam
    15:32 Run 3684 1.2M

    ............................................Total Events this shift 9.13M
    ............................................Total Charge: 1.07

    15:50 Run 3685 started still running at shift end
    Beam appears somewhat better, still getting trips (6 in the last 30 minutes)
    -JJL