Log entry time 08:02:05 on November 3,2000
Entry number 51403
keyword=Shift summary
Shift crew : M. Rvachev, F. Benmokhtar, M. Jones, E. Brash/V. Punjabi
0:00 Doing harp scans; results of harp scan#1161:
______epics..harp(mm)
4B.Y..-0.42...-0.02
4B.X....0.30......0.04
4A.X..-0.07.....0.35
4A.Y.....0.34....0.65
1:30 Visual check of beam position on BeO target. With beam at (0,0) in
epics beam spot looked ~3mm to the left of the crossing.
2:10 Doing current calibration (steps of 50uA and 0uA) on empty target.
2:34 MCC starts fixing injector and tuning problems.
3:10 Mark noticed absence of 3 TDC signals on right arm S1 scintillator plane,
asked for access to fix.
3:58 Mark pushed the cables and signals are back. Hall back to beam permit.
6:42 Continue current calibration, but with carbon target in.
7:12 Beam off for tuning.
~ 1 hour available beam on this shift..
Run summary:
run#...start/stop.....events...comments
1032.18:36/0:35...0.49M...cosmics with some current on empty target
1033..0:37/0:40.....4K........harp scan#1159, raster 1x2mm
1034..0:54/0:54....10K.......harp scan#1160, raster off
1035...junk
1036..1:02/1:03....13K.......harp scan#1161, raster off
1037..2:10/2:13....386K.....first 2 steps of current calibration
1038..2:14/2:34.. .23K.......next 3 steps of current calibration (and trip on 4th step)
1039..cosmics to check detectors
1040..more cosmics after access to touch scintillator TDC cables
1041..6:42/6:47.....15K......1 step of current calibration; carbon target since now is in
1042..6:56/7:12.....40K......4 more steps of current calibration (and 4 fast spikes of 50uA)