Main INDEX
Monthly INDEX
PREV
NEXT
User name aniol / strauch
Log entry time 16:00:33 on December 6,2000
Entry number 53012
keyword=day shift summary
8:00 - Accelerator separator cavities failed. Beam is down. Repairs in progress. No prognosis.
8:57 begin run 1669
09:00 separator tripped off again end run 1669
09:09 start run 1670
10:00 --- Half wave plate change from "OUT" to "IN" position.
10:03 start run 1671
10:45 MCC called: There might be a problem with the Hall-A beam dump
11:07 MCC problem solved
11:09 start run 1672
12:00 start run 1673
Note that input comment on electronic log file indicates absence of target. This is not correct, some glitch on the input log or a mistake. The target is LH2=15cm.
13:12 start run 1674
14:05 start run 1675
14:10 Hall C down, asked for more beam current, now at about 68 uA.
14:33 FPP HV 7.1.6 trip
14:35 start run 1676
14:55 FPP HV 7.1.6 trip (during run 1676)
15:15 start run 1677