    16:04 Start run 1809
    16:50 Stop run 1809. Water main break in the acclerator caused loss of beam. We will be down for at least one hour. In the meantime, the end of run failed for this run. Rebooting DAQ.

    Run 1810 is an empty run taken to check DAQ after the reboot.

    21:28 MCC is finally ready to deliver some beam.

    21:31 Start run 1811
    21:45 Stop run 1811 IOC problem in accelerator

    21:50 Start run 1812
    22:03 Stop run 1812, RF control module is not responding. Beam off.

    22:19 Start run 1813
    23:10 Stop run 1813

    23:11 Start run 1814
    24:00 Evening shift go off air.