User name LeRose
Log entry time 13:14:27 on January18,2001
Entry number 55005
Followups:
keyword=Energy Measurement Aborted
ARC energy measurement failed because we had problems turning on the HV to the PMT's. Standard proceedures did not work (could have been operator error).
Decided to postpone measurement so the problem could be solved without wasting beamtime.