• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name LeRose

    Log entry time 16:01:34 on January29,2001

    Entry number 56148

    keyword=Shift Summary

    shift starts with run 1858 in progress (kinematics 7)

    run start/stop # events
    1858......0736/0852....0.75M
    1859......0852/0908....0.09M left HV trip ends run
    1860.....0910/ 0932...0.24M
    Dummy Target
    1861....0939/0945.....0.5M

    BeO target
    0945 doing BeO test: 3mm up and 2mm left. (stable)

    Optics target
    1862 Junk
    1863....0959/1007.....0.59M

    1010-1040 Access for angle change
    change to kinematics 9: Left arm 12.55 and 1.89 GeV/c

    1864...1049/1054 .......0.75M optics
    1865...1054/1057........0.27M optics reduced to 10 microamps

    changed to 15 cm dummy
    1866....1100/1103......0.75M 15cm dummy
    changed ps3 to 20
    1867....1103/1108......0.7M

    changed to H2 target (reset prescales)
    1868...1114/1124.......0.075M low current with fastfeedback off
    1869...1126/1139.......0.75M
    1870...1140/1151.......0.75M
    1871...1151/1207.......0.75M
    1872...1207/1224.......0.75M
    1873...1224/1237.......0.75M
    1874...1237/1248.......0.75M
    1875...1249/1259.......0.75M
    1876...1300/1318.......0.75M
    1877...1318/1329.......0.75M

    14 minutes for change to Kinematics 8 (Left Arm to 27.849 degrees po=1.89 GeV/c)
    1878....1343/1511.....0.75M
    changed left VDC discriminator levels from 4.0 to 3.5
    1879....1512/...........passed on to swing shift