User name McCormick/Mitchell
Log entry time 16:37:10 on March 5,2001
Entry number 57780
keyword=Target cooldown completed
keyword=Target cooldown completed
16:00 completed cooldown He4 target. The Switch
took about 7 hours. The target state is: 5.8K, 220 psi, Fan: 60 Hz.
The fan seems to be oscillating a little, causing the target temperature
to oscillate by 0.02 K. The heat load is set to ~150 Watts, which
should accomodate ~25 uA. If the target operator has to adjust the heat load, it should be done slowly, so as to cause no pressure fluctuation that could vent the loop. The net target motion during the warmup/cooldown was zero, as the target
returned to it's original position after cooldown.