• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Sulkosky

    Log entry time 08:02:23 on July19,2001

    Entry number 66699

    keyword=Shift Summary

    0:00 Data taking with polarized 3He target in 0 degree configuration at x = 0.48. Beam half-wave plate OUT.
    0:10 MCC called. They need to reboot an IOC and re-initialize the raster. Beam Off.
    0:38 Beam Back. Resume data taking at same kinematics.
    5:10 Call MCC to Mask Target for Polarization measurement.
    5:17 NMR measurement Done. Polarization: 43.7 %
    5:20 EPR Measurement. Polarization: 44.9 %
    5:27 Beam back. Resuming data taking at x = 0.48.
    8:00 Hand shift over to Morning crew.

    ******************
    Run Summary:
    2110/21110/1270 22:55 - 00:22 Production Run.
    2111/21111/1271 00:39 - 02:11 Production Run.
    2112/21112/1272 02:12 - 03:37 Production Run.
    2113/21113/1273 03:39 - 05:09 Production Run.
    2114/21114/1274 05:27 - 06:58 Production Run.
    2115/21115/1275 06:59 - 08:?? Production Run.