• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 08:20:38 on September 11, 2001

    Entry number 74202

    keyword=Beam Time Accounting
    Hall A

    9/11/2001 0000-0800
    Experiment #: e97103
    Shift Leader: Kevin Kramer
    Shift Workers: Yuan Xiao, Jindong Zhou

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    0 36 55.0 51.6 45.1 57.7 55.2 46.5 5.785
    Beam Available
    but Not in Use
    0 14 0 0 0 0 0 5 0.316666666666667
    Beam Not Available
    or Unacceptable
    60 10 5.0 8.4 4.9 2.3 4.8 8.5 1.73166666666667
    Accelerator Con-
    figuration Chage
    0 0 0 0 10.0 0 0 0 0.166666666666667
    Experiment
    Ready
    60 46 60.0 60.0 60.0 60.0 60.0 55 7.68333333333333
    Planned Config-
    uration Change
    0 14 0 0 0 0 0 5 0.316666666666667
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 14 0 0 0 0 0 0 0.233333333333333
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 01:13 - 01:33 5uA on Carbon Target, looked at raster, centering beam 01:34 - 01:48 Performed NMR/EPR Moved target to pol3he (90,out) position. 01:48 looked 5uA on pol3he target 01:58 raised current to 12uA 04:10 - 04:20 MCC performed QE measurement 07:55 Started NMR/EPR measurement

    Data Entry by: Kevin Kramer