Main INDEX
Monthly INDEX
PREV
NEXT
User name jpchen
Log entry time 00:04:21 on September13,2001
Entry number 74327
keyword=9/12 swing shift summary
9/12 swing shift
Shift workers: J. P. Chen, P. Solvignon, D. Dutta.
16:00 Production data for Kin5, beam/target=IN/270degree.
19:45 MCC need to tune for Hall B, took beam away from us.
19:50-20:30 NMR/EPR=42.9%/42.9%
20:30-21:54 Resume data taking at Kin5, In/270 degree.
21:54- MCC take beam away to tune for Hall B.
22:35 resume data taking.
24:00 Hand to next shift.
Good e before the shift: 1.00 M
Run# good e Grand total
3434/31434 134k/138k 1.27M
3435/31435 137k/140k 1.55M
3436/31436 128k/133k 1.81M
3437/31437 114k/117k 2.04M
3438/31438 134k/140k 2.31M
3439/31439 41k/42k 2.39M
3440/31440 149k/154k 2.69M
3441/31441 still running at the end of shift