User name LeRose
Log entry time 16:02:10 on September14,2001
Entry number 74554
keyword=Shift Summary
9/14/01 Day shift
J. LeRose, N. Liyanage, Y. Xiao
At start of shift noticed that left dipole NMR signal was bad and fixed it (see halogs 74519 and 74525). Dipole field regulation appears to not be working. Have set the magnet manually and all appears stable. Since we're only running till midnight anyway it seems best to leave things as they are.
Target polarization measurement at 10:49 (see halog 74533)
NMR P=39.9%
EPR P=39.7%
11:20 Arun Saha tests arc scanners (see halog 74534)
11:42 Target is back in requested beam on target
11:50 asked for beam off for 1 minute to reboot the compton polarimeter IOC (David Lhuillier's request) That's about how long it took too.
14:00 MCC takes beam away for Hall C current calibration
Rotating target holding field to zero degrees and pumping longitudinaly
15:03 MCC ready to deliver beam/we start to restore target holding field etc.
15:09 Target is ready
run...start/stop.........L/R .........total
476 7:51/8:51 130k/129k 10.14M
477 8:51/9:49 126k/126k 10.38M
478 9:50/10:47 137k/137k 10.64M
479 11:45/12:41 127k/130k 10.90M
480 12:42/13:39 127k/128k 11.14M
481 13:40/14:00 56k/56k 11.26M
482 15:11/passed to next shift