Main INDEX
Monthly INDEX
PREV
NEXT
User name R. Michaels/ B. Reitz
Log entry time 15:19:50 on October10,2001
Entry number 74768
keyword=trigger checkout
The trigger and DAQ are checked out and ready to go,
with the exception of S0 connections on R-arm. We
simulated the coincidences and checked timings at
critical points in the trigger for R-arm proton momenta
from 0.7 GeV/c to 4.0 GeV/c. For 4 GeV/c the "TC"
(coincidence time measured on R-arm) should appear
at 180 nsec, and decreases by 57 nsec as one goes to 0.7 GeV/c.
We also checked the ADC gate timing. If someone wants
to start a cosmics test.... go ahead.