    User name adaq

    Log entry time 00:01:23 on October 26, 2001

    Entry number 75001

    keyword=Beam Time Accounting
    Hall A

    10/25/2001 1600-2400
    Experiment #: e00102
    Shift Leader: R Roche
    Shift Workers: E Chudakov, M Potokar

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0 0 0 12 0 0 20 30 1.03333333333333
    Beam Available
    but Not in Use
    0 0 0 0 10 0 0 0 0.166666666666667
    Beam Not Available
    or Unacceptable
    1 1 1 48 50 1 40 30 6.8
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 0 0 20 1 5.33333333333333
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 1 1 40 02.66666666666667
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 10 0 0 0 0.166666666666667

    Comments: 10 minutes spent trying to figure out how to analyze harp scan. Then determined that the beam width was too small. The unplanned experiment down time was due to beam tuning for an acceptable width.

    Data Entry by: R Roche