NEXT
User name Reitz
Log entry time 00:04:24 on October27,2001
Entry number 75107
keyword=swing shift summary
16:00 no beam
17:30 ended run 1238, changed some delays for rich, downloaded trigger, changed to
withrich configuration and started another cosmic run
19:15 mcc restored beam, we put BeO in and asked for 5 uA
unrastered to check beam position, was 0/0 at BPMA and
BPMB
19:36 start second part of the waterfall current scan
RunID Current NoEvents Comment
1240 77uA 2M PS 1/1/1/1/1
1242 77uA 1.8M 400/20/2000/200/1
1243 100uA 1.3M 1/1/1/1/1
1244 100uA 2.2M 500/30/2400/2500/1
20:25 MCC tried to reach 120 uA, but experienced a lot of
beam trips, and decided, that they are only able to deliver 80-uA
=> We decided to go to the white spectrum scan for HRS right
20:55 during cycling of right Q2, it tripped, tech on call came in to
reset it, therefore we needed an access
22:40 magnets are fine, beam is back, starting white spectra scan on right arm
runid noevents po_left po_right target comments
1245 1.5M 4120 1114 water PS=1 run
1246 2.0M 4120 1114 water normal run
1247 1.0M 4120 1114 water normal run
changed momenta to 4.12 / 1.098 Gev
1248 1.0M 4120 1098 water PS=1 run
1249 1.0M 4120 1098 water normal run
next shift continues