    User name Mattias

    Log entry time 23:56:59 on November29,2001

    Entry number 78329

    keyword=Shift Summary

    Shift summary 11/29/01, 16.00-00.00
    M. Andersson, L. Weinstein, K. Fissum

    16.00 : Shift started while running 2649.
    17.05 : MCC called. Problems with OTR, perhaps a hole in the foil. Beam will be down for some time.
    17.20 : MCC told us that there is indeed a hole in the OTR foil and that a HARP scan should be done. However, they need to reboot an IOC to do that. Meanwhile, we will get the beam back.
    18.15 : MCC called to say that the double peak we see in the OTR comes from the beam being 1.5mm wide in the y-direction, and the hole in the OTR foil. They are rebooting an IOC and when that is done, they will do a HARP scan.
    18.34 : MCC ready for HARP scan. Stopping run 2654.
    18.55 : The HARP scan result was that the OTRs were a factor of five off and that the actual size of the beam was 60um x 360 um. This is not too bad and we'll just go on as is. Requested 55uA beam.
    19.10 : Beam is back.
    22.25 : MCC called, they have RF problems. Beam will be down for a while.
    22.40 : Beam is back.
    00.00 : Shift ended while running 2665.

    Run# #events Charge Total charge
    2649 2.7 22.8 2195.8
    2650 2.7 22.7 2218.5
    2651 2.7 22.5 2241.0
    2652 2.7 22.2 2263.2
    2653 2.7 22.2 2285.4
    2654 1.6 13.3 2298.7
    2655 2.7 22.5 2321.2
    2656 2.7 22.5 2343.7
    2657 2.7 22.6 2366.3
    2658 2.7 Trigger efficiency
    2659 2.7 22.5 2388.8
    2660 2.7 22.5 2411.3
    2661 2.7 22.5 2433.8
    2662 2.7 22.6 2456.4
    2663 2.7 22.6 2479.0
    2664 2.7 22.6 2501.6