    Log entry time 12:34:49 on May 8,2002

    Entry number 2912

    This entry is a followup to: 2682

    keyword=Filling out Beam Time Accounting

    Apparently, it is not acceptable to "scale" the beam usage as I suggested my previous entry. If we take any useful beam at all, whether or not the current is at the requested level, we should count it as a full abu. This means we need to carefully consider if we would rather take beam at currents lower than desired, or request accelerator work on the beam until the desired current is reached.

    If the beam quality is too poor in other ways (i.e. too many trips, etc.) - we should ask for a retune.