    0:25 beam ramp up 30,50,70,90 mkA
    0:27 start run 1249 -- 0.10 M events
    0:34 beam OFF ; RF trip
    1:15 beam back, beam ramp to 50,60,70,80,90 mkA
    1:45 start run 1251 -- 1.00 M events
    2:12 stop run 1252 -- 0.86 M events
    3:12 lost beam - vacuum problen in North linac
    3:40 beam back
    3:41 start run 1253 -- 0.09 M
    3.38 start run 1254 -- 0.52 M
    4:16-4:45 configuration change to Q1_f50
    4:47 start run 1256 - optic target
    5:05 start run 1257 - production -
    start run 8257 - 280k events
    5:27 beam off - vacuum problem
    5:35 start run 1259 - 1 M
    6:17 start run 1260
    6:47-7.25 configuration change
    7:25 start run 1261 - cross normalization