• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Michaels

    Log entry time 05:42:14 on June15,2002

    Entry number 86067

    keyword=checklist notes

    In doing the shift checklist, we decide to not panic about :

    1. The BPM 4A is not within spec. It is X=0.75, Y=1.04 mm. But MCC cannot
    put both 4A and 4B within spec simultaneously.
    2. There is an alarm from alarm handler because of Flow rate on L-arm Q1
    (red highlighted value of -23 l/m)
    3. N2 cryolevel CLL71Q210 is at 19%, not the desired >25%.