    User name R. Michaels

    Log entry time 08:00:12 on June17,2002

    Entry number 86252

    keyword=owl shift summary

    Crew: R. Michaels, M. Roedlebronn, M. Zeier, B. Milbrath

    We came in part-way through kinematics Q2_Acc.

    Procedure..........Run..........Comments

    ix).....................1565...........15 cm LH2, sieve on L-HRS, open R-HRS
    x)......................1566...........open collim. L-HRS, the rest same
    xi).....................1567...........6 msr on L-HRS
    xii)....................1568...........6 msr on R-HRS (so, both HRS with 6 msr)
    xiii)...................1569...........4 cm LD2
    xiv)...................1570...........open collim. on R-HRS
    xv)....................1571...........open collim. on L-HRS (so, both HRS open)
    xvi)...................1572...........15 cm LD2

    Next, we go to kinematics Q2_f10r by changing
    P_R = 1.8225 theta_R = 45.97

    Run...........Comments

    1573..........junk
    1574..........9 Foil Optics
    1575..........Production....1 M events (more than enough)
    1576..........R-arm efficiency (ps1 = ps2 = 1)

    Next, we go to kinematics Q2_f10l by changing to theta_R = 39.71

    1577..........9 Foil Optics
    1578..........Production....1 M
    1579..........R-arm efficiency

    Next, kinematics Q2_f20l. P_R = 1.8047 theta_R = 36.60

    1580..........9 Foil Optics
    1581..........Production..........340 K ended with CODA crash
    1582..........Production..........in progress

    Problems on shift: Mostly smooth, but had

    problems with bogies and Q1-L


    Our ABU's disagreed with MCC's reckoning (they had 1.5 hours more) presumably
    because we left beam on sometimes during problems. For production one may use
    automatic ABU accounting