    Log entry time 08:00:04 on June22,2002

    Entry number 86579

    keyword=owl shift summary

    Crew: R. Michaels, P. Townsend, P. Moussiegt, E. Piasetzky

    We start the shift with beam at about 2/3 of the kinematics Q2_g50

    Run.........Comments

    1713........Q2_g50 Production....1M events...roc14 crashed right at the end
    1714........Production....1 M
    1715........Production....1 M
    1716........Production....1 M
    1717........Efficiency run (ps1 = ps2 = 1)

    Next we setup "cross normalization run", kine Q2_giN
    by changing theta_R to 51.21 (the only change)

    Problem: R-arm bogies don't move. Take access to power cycle them.
    This worked fine. We lost 20 minutes.

    1718........Q2_giN run.......1 M

    Next we setup Q2_i20 by changing to P_L = 3.8737 theta_L = 19.55
    Note: L-arm dipole did not adjust automatically when we entered the momentum. We had to adjust it manually.

    1719......... 9 Foil Optics
    1720..........Production....... 1 M
    1721..........Production........100 K ....CODA crash
    1722..........Production........1 M
    1723..........Production........in progress

    We left it here. Had problems with analysis (see halog).