    Crew: R. Michaels, H. Ibrahim, E. Voutier, P. Moussiegt

    As we came in, the shift was just finishing Q2_ijN cross normalization.
    Now we set to Q2_j30 by changing L-arm to
    P_L = 3.9682 Theta_L = 19.31

    Run..............Comments

    1744 and 1745........9 Foil Optics. (1744 is short run with wrong PS factor)
    1746.............Production...... 260 K
    1747.............Production...... 440 K
    1748.............Production...... 1 M
    1749.............Production...... 1 M
    1750.............Production...... 10K..... roc14 crash
    1751.............Production.......500K....roc14 crash
    1752.............Production.......163K....roc14 crash
    1753.............Production.......283K....roc14 crash...4th time
    1754.............Production.......711K
    1755.............Production........1 M
    1756.............Efficiency run...(ps1=ps2=1)

    Next, we move to kinematics Q2_j40 by changing R-arm to
    P_R = 1.2815 theta_R = 62.09
    But first.... we must power cycle R-arm bogies (15 min access)

    1757............9 Foil Optics
    1758............Production........300 K......stop due to Q1-L trip