1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0 | 0 | 3 | 30 | 50 | 50 | 49 | 51 | 3.88333333333333 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Beam Not Available or Unacceptable | 60 | 60 | 57 | 30 | 10 | 10 | 11 | 9 | 4.11666666666667 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 60 | 8 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons |
Comments: Pretty smooth running once beam came back, but with more trips than usual (and logner recovery times).
Data Entry by: J Arrington