0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 26 | 0 | 0 | 23 | 52 | 51 | 58 | 54 | 4.4 |
Beam Available but Not in Use | 25 | 60 | 0 | 0 | 0 | 0 | 0 | 0 | 1.41666666666667 |
Beam Not Available or Unacceptable | 9 | 0 | 60 | 37 | 8 | 9 | 2 | 6 | 2.18333333333333 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 35 | 0 | 15 | 60 | 60 | 60 | 60 | 60 | 5.83333333333333 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Unplanned Experiment Down | 25 | 60 | 45 | 0 | 0 | 0 | 0 | 0 | 2.16666666666667 |
Hall not ready reasons |
Comments: 9:50 Vacuum problem traced to ep turbo pump (replaced by Ed Folts) 10:00-11:34 Machine development time
Data Entry by: J. LeRose