    User name Saha

    Log entry time 16:02:32 on January 7,2003

    Entry number 90774

    keyword=Day Shift Summary


    0800: IA scan in progress.
    0820: Optics Run #2 (with Sieve Slit) : 20139 Left Arm, 1139 Right Arm
    ~830: Optics Run #2 continued: 20140 Left Arm, 1140 Right Arm
    0843: Optics setting #2 done, changing p0 from 1.042 -> 0.965
    0910: magnets okay
    0935: beam back
    *** Optics setting #3 ***
    0937: 20141 Left Arm, 1141 Right Arm 30% dead, need to set PS's to 2
    0939: 20142 Left Arm, 1142 PS's to 2, but beam taken away to spend 10
    minutes on Hall B beam tuning
    0952: beam back, Left Arm 20143, Right Arm 1143
    1014: Left Arm 20144, Right Arm 1144
    1025: Left Arm 20145, Right Arm 1145
    10:40: Optics setting #3 done, go to ARC energy measurement

    Wait for MCC, wait, wait...

    ~11:40: AS in test determines that there appears to be broken wire in scanner.
    The ARC ep measurement is scrapped. Going to target polarization measurement.

    12:40 target polarization measurements done, go to temperature tests

    14:00 temperature tests done, Bob Michaels now in Hall on controlled
    access working on DAQ.

    14:45 finish DAQ access, at the end of it we also go into the Hall and reset
    the two tripped Q1s, before the control access checklist
    15:00 MCC sending tuning beam into Hall,
    15:15 Eugene came to do Moller measurement.